Filters
The influence of alite polymorphism on the properties of portland cement (GA103/98/0355)
of raw meals for burning of clinkers with different alite polymorph will be prepared its reactivity, introducing extra amounts of Mg0 or 503, and changing the burning regime or pre-heating the raw meal. The clinkers
JJ - Ostatní materiály
- 1998 - 2000 •
- 1 579 tis. Kč •
- 1 579 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1998 - 1. 1. 2000
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Dosing optimization of alternative fuels with high content of P2O5 during cement production. (FT-TA3/026)
will be a research of P2O5 influence on burning process and on properties of portland clinker.Theoretically and experimentally substantiated method of a co-burning of biomass with high content of P2O5 in a cement rotary ki...
JN - Stavebnictví
- 2006 - 2010 •
- 16 838 tis. Kč •
- 10 752 tis. Kč •
- MPO
Řešení projektu: 1. 6. 2006 - 31. 5. 2010
Uznané náklady
Podpora ze státního rozpočtu (64%)
Poskytovatel: Ministerstvo průmyslu a obchodu
The role of combination of fluxes, mineralizers and SCMs on properties of low-energy clinker (GA23-05122S)
Understanding the mechanisms of pre- and post-activation of low-energy clinker and the properties of clinker and cement and defines the relationship between pure clinker phases, model and industrial clinker. New fi...
Civil engineering
- 2023 - 2025 •
- 8 851 tis. Kč •
- 8 851 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2023 - 31. 12. 2025
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
The influence of belite clinker formation kinetics on the hydraulic activity of belite cement (GA103/03/0064)
and kinetics of the belite clinker formation on its the hydraulic activity on thevelocity of clinker formation, which is the reason why belite in belite clinker is much more active than belite in alite-belite clinker
JN - Stavebnictví
- 2003 - 2005 •
- 4 930 tis. Kč •
- 3 496 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2003 - 1. 1. 2005
Uznané náklady
Podpora ze státního rozpočtu (71%)
Poskytovatel: Grantová agentura České republiky
The research on the combined effect of sulfur, copper and lithium oxides on the formation and properties of Portland cement clinker. (GA23-05082S)
and Li2O on the Portland clinker formation and to broaden the knowledge in the field composition, structure and properties of clinker. It is known that both Li and Cu have a positive effect on clinker burnability and negat...
Civil engineering
- 2023 - 2025 •
- 9 324 tis. Kč •
- 9 324 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2023 - 31. 12. 2025
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Greenhouse gas emission reduction by using of new waste origin solid recovered fuels with higher biomass content for portland clinker burning and hydraulic binders of cement type production together (FR-TI2/151)
Basic fossil fuels substitution by energy and emissions more economic fuels on biomass basis of waste origin, e.g. from mechanical - biological separation of minucipal waste in comparision with other alternative fuels with biomass fraction e.g. waste...
JN - Stavebnictví
- 2010 - 2012 •
- 18 500 tis. Kč •
- 14 700 tis. Kč •
- MPO
Řešení projektu: 1. 3. 2010 - 30. 11. 2012
Uznané náklady
Podpora ze státního rozpočtu (79%)
Poskytovatel: Ministerstvo průmyslu a obchodu
Study of effects of samples preparation on inorganic binders final properties (GA15-08755S)
difficult to produce in kilns burning gaseous fuels. In this area, in terms by burning....
JN - Stavebnictví
- 2015 - 2019 •
- 2 772 tis. Kč •
- 2 772 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2015 - 25. 4. 2019
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Research of new cement binders with an optimized content of non-traditional raw materials. (FT-TA/020)
This project is directed at a preparation of new economically and ecologically positive cement binders using non-traditional raw materials. A global appraisal of individual raw materials from the point of view of their usefulness in individual stages...
JN - Stavebnictví
- 2004 - 2007 •
- 13 117 tis. Kč •
- 8 639 tis. Kč •
- MPO
Řešení projektu: 1. 8. 2004 - 31. 12. 2007
Uznané náklady
Podpora ze státního rozpočtu (66%)
Poskytovatel: Ministerstvo průmyslu a obchodu
The elimination of the negative impact of zinc in Portland cement by accelerating concrete admixtures (GA19-16646S)
containing zinc, the amount of zinc in the clinker and secondary raw materials is increasing in recent years. Portland clinker can gain zinc from solid waste or tires which are widely used as a fuel for a burning in rotary...
Civil engineering
- 2019 - 2023 •
- 3 473 tis. Kč •
- 3 473 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2019 - 31. 12. 2023
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Increasing the durability of concrete pavements of roads by limiting the effect of alkali-silica reaction (ASR) (TH04010207)
+) in ASR; -to find the type of binding of alkalis in the Portland clinker; -to find in the Portland clinker in the start moment and during the ASR; -to identifying the risk alkali forms in clinker and cement in terms o...
Construction engineering, Municipal and structural engineering
- 2019 - 2022 •
- 21 496 tis. Kč •
- 12 802 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2019 - 31. 12. 2022
Uznané náklady
Podpora ze státního rozpočtu (60%)
Poskytovatel: Technologická agentura ČR
- 1 - 10 out of 231