All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

5 731 (0,158s)

Project

An analitical software module for the real-time resilience evaluation from point of the converged security (VI20172019054)

of physical and cyber security managements or business continuity management.The project defines a converged security management based on the cooperation between the physical and cyber security managements

JA - Elektronika a optoelektronika, elektrotechnika

  • 2017 - 2019
  • 19 431 tis. Kč
  • 14 573 tis. Kč
  • MV
Project

Gender in management (1J046/05-DP1)

The difference between the job income of men and women continually reaches 25 ? 27% to the detriment of women and it is continually increasing. The greatest disparity is constantly reached in the category of leading and managing...

AO - Sociologie, demografie

  • 2005 - 2008
  • 2 412 tis. Kč
  • 2 337 tis. Kč
  • MPSV
Project

Proposal of new indicators for continuous monitoring efficiency of environmental management systems with respect to branches (NACE) and system of their environmental reporting with evaluation (SP/4I2/26/07)

Proposal of appropriate indicators for continuous monitoring and evaluation relationships among environment, economy and society....

AH - Ekonomie

  • 2007 - 2010
  • 5 521 tis. Kč
  • 4 504 tis. Kč
  • MŽP
Project

Business Processes Modelling (GA402/08/0529)

for modeling an enterprise and its business processes. The project continues in the results cooperation in the context of foundation of the Slovak Association for Process Management additional products of the preceding project are ...

IN - Informatika

  • 2008 - 2010
  • 951 tis. Kč
  • 951 tis. Kč
  • GA ČR
Project

Portfolio tracking and analytics web app for crypto markets (TG05020001)

for our management to either continue with current roadmap, or whether to adjust ourMain goal of the feasibility study is to decide whether to continue with current roadmap and development. Our research will consist of mar...

Business and management

  • 2019 - 2019
  • 1 833 tis. Kč
  • 1 008 tis. Kč
  • TA ČR
Project

Non-destructive determination of mechanical stress in continuous welded rail (TJ04000301)

The main goal of the project is to propose a methodology that enables determination of stress state in continuous welded rail (CWR) by non-destructive methods by this research to the railway infrastructure managers resulting in safe...

Transport engineering

  • 2020 - 2022
  • 4 172 tis. Kč
  • 3 538 tis. Kč
  • TA ČR
Project

Development of a system for continuous identification and ethological monitoring of animals in cattle breeding by methods of Artificial Intelligence (FW01010391)

The aim of the project is to keep track of the continuous monitoring and monitoring of animal development in cattle breeding. The system consists of a set of several cameras that are considered appropriate to obtain input image information a...

Robotics and automatic control

  • 2020 - 2023
  • 11 089 tis. Kč
  • 7 686 tis. Kč
  • TA ČR
Project

Multiple-Criteria Decision Making (MCDM) Methods and Their Applications in Business Management and Finance (MEB050834)

and continuous problems. The applications of MCDM models and methods are possible in many areas, as operations, finance, project management.......

BB - Aplikovaná statistika, operační výzkum

  • 2008 - 2009
  • 117 tis. Kč
  • 117 tis. Kč
  • MŠMT
Project

Process management tools ensuring security and functionality of crisis infrastructure with emphasis on the area of transport (VI20152018039)

The aim of the project is the introduction of process management tools resilience, how to ensure continuity in relation to the processes of operators, so - on the possibilities of continuous monitoring and verifiying level ...

AE - Řízení, správa a administrativa

  • 2015 - 2018
  • 16 480 tis. Kč
  • 14 008 tis. Kč
  • MV
Project

Complex hydrogen safety and security in the Moravian-Silesian Region (TK05010075)

technologies (technical and safety management system aspects), b) the system for ensuring the continuity of activities (BCMS according to ISO 22301) of the hydrogen infrastructure......

Energy and fuels

  • 2023 - 2025
  • 9 333 tis. Kč
  • 8 527 tis. Kč
  • TA ČR
  • 1 - 10 out of 5 731