Filters
Show more
Show more
Show more
Show more
Show more
Show more
More filters
Projects
Modelling of smart damping elements of rotating systems utilizing the physical properties of magnetorheological fluids (GA15-06621S)
inertia, damping and stiffness effects and in taking into consideration the coupled physical phenomena occuring in the damping elements. Among them there are the electromagnetic effects caused by the change of ele...
JR - Ostatní strojírenství
- 2015 - 2017 •
- 5 558 tis. Kč •
- 5 558 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2015 - 31. 12. 2017
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Developement of Magnetorheological Damping System for Railway Vehicles (FV30310)
magnetorheological dampers. This type of dampers enables adaptive accommodation of damping effect into the damper with fast response will add a possibility of semiactive damping force control and so further improvement of ...
Transport engineering
- 2018 - 2021 •
- 10 000 tis. Kč •
- 8 000 tis. Kč •
- MPO
Řešení projektu: 1. 1. 2018 - 30. 6. 2021
Uznané náklady
Podpora ze státního rozpočtu (80%)
Poskytovatel: Ministerstvo průmyslu a obchodu
Effect of combination of soil-structure interaction and passive damping elements on dynamic response of tall slender structure (GP13-41574P)
in practice neglected. Similarly overlooked is the expression of non-classical damping structure, which is caused e.g. by presence of a damping element and which can also to study the combined effect of both these phenomen...
JM - Inženýrské stavitelství
- 2013 - 2015 •
- 943 tis. Kč •
- 943 tis. Kč •
- GA ČR
Řešení projektu: 1. 2. 2013 - 31. 12. 2015
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Dynamics of elastic rotors supported in plain bearings with additional damping (GA101/97/0694)
rotors supported in plain journal beatings with additional damping of the outer oil film. Deriving a suitable representation of dynamic effects of plain bearing oil of the whole bearing clearence. Description of dynamic forces ...
JC - Počítačový hardware a software
- 1997 - 1998 •
- 992 tis. Kč •
- 852 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1997 - 1. 1. 1998
Uznané náklady
Podpora ze státního rozpočtu (86%)
Poskytovatel: Grantová agentura České republiky
Transfer of smart and innovated damping technology into the suppression of vibration and noise for railway resilience wheels and vehicle motor mounts (TF06000020)
and innovative damping technologies into the railway wheels. At rubber-damped wheels, new compounds wlll be proposed for production of damping rubber segments resistant to fatigue and envirenmental influences for highly <...
Acoustics
- 2019 - 2021 •
- 8 936 tis. Kč •
- 6 576 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2019 - 31. 12. 2021
Uznané náklady
Podpora ze státního rozpočtu (74%)
Poskytovatel: Technologická agentura ČR
Research and modelling of the effect of control of yielding stress of magnetorheological liquid in a thin lubricating film on vibration of rotors (GAP101/10/0209)
). The damping effect is produced by squeezing a thin lazer of lubricant whose properties can the mathematical models of nonlinear damping elements, on their implementation to analyze the effect of control of the ...
JR - Ostatní strojírenství
- 2010 - 2012 •
- 2 957 tis. Kč •
- 2 957 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2010 - 31. 12. 2012
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Research of dynamic behaviour and optimalization of complex rotating systems with non-linear couplings and high damping materials (GA101/09/1166)
rotary mechanical systems with passive and active vibration damping elements under of the beam elements and/or an additional damping using high-damped materials. The results damping and to reduction of vibration a...
BI - Akustika a kmity
- 2009 - 2013 •
- 6 492 tis. Kč •
- 6 492 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2009 - 31. 12. 2013
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Semiactive damping system for single deck electric multiple unit (CK04000210)
The goal of the project is the development and verification of an semi-active (S/A) controlled damping system for the single deck EMU, based on fast S to decreasing negative dynamic effects in rolling stock/railroad interaction and ...
Automation and control systems
- 2023 - 2026 •
- 8 000 tis. Kč •
- 6 400 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2023 - 31. 12. 2026
Uznané náklady
Podpora ze státního rozpočtu (80%)
Poskytovatel: Technologická agentura ČR
Optimum length proposal of the 1st stage of mining activity damping of underground coal mines (GA105/99/0080)
The term "mining activity damping" indicates the organised extraction decrease of grant project solving will be the 1st stage of damping, i.e. term when coal activity damping concerning the closed mines and proposal of opti...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 1999 - 2000 •
- 440 tis. Kč •
- 440 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1999 - 1. 1. 2000
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Aerodynamic bodies with actively controlled morphing (GA19-16772S)
research directions. The first direction will be reserach leading to active damping due to resulting aerodynamic effects, another direction will be research of possibilities of lift-to-drag ratio. Simulation models comprising aeroe...
Aerospace engineering
- 2019 - 2022 •
- 7 286 tis. Kč •
- 6 284 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2019 - 30. 6. 2022
Uznané náklady
Podpora ze státního rozpočtu (86%)
Poskytovatel: Grantová agentura České republiky
- 1 - 10 out of 10 135