Filters
General methodology and CAE system development for AID in cable system design and management. (FI-IM3/173)
The project is focused on a general methodology and CAE system development as an aid the design and management of large and complex cable systems. The general methodology together with the CAE system will provide a comprehensive met...
JD - Využití počítačů, robotika a její aplikace
- 2006 - 2008 •
- 12 715 tis. Kč •
- 2 558 tis. Kč •
- MPO
Řešení projektu: 6. 6. 2006 - 30. 5. 2008
Uznané náklady
Podpora ze státního rozpočtu (20%)
Poskytovatel: Ministerstvo průmyslu a obchodu
Intergrated Information Portal (SK/250/07/03)
Design and verification of the complex systems of management processes including content management, information management, business process managment, etc.......
AF - Dokumentace, knihovnictví, práce s informacemi
- 2003 - 2005 •
- 6 845 tis. Kč •
- 5 835 tis. Kč •
- MŽP
Řešení projektu: 1. 1. 2003 - 1. 1. 2005
Uznané náklady
Podpora ze státního rozpočtu (85%)
Poskytovatel: Ministerstvo životního prostředí
Transport dangerous goods management in relation to system crisis management in Czech Republic at the European and national level. (CG742-015-030)
The main project target is system design of the transport dangerous goods management in relation to system crisis management in Czech Republic together with recommended standards. Final design will be implemented b...
AP - Městské, oblastní a dopravní plánování
- 2007 - 2010 •
- 14 000 tis. Kč •
- 11 900 tis. Kč •
- MD
Řešení projektu: 1. 4. 2007 - 31. 12. 2010
Uznané náklady
Podpora ze státního rozpočtu (85%)
Poskytovatel: Ministerstvo dopravy
Design of Information System for Management of University (ME 494)
. Elaboration of subsystems for education process control, document management and designResearch of methods and technologies usable for the computerised university management. Problems analysis, formulation of goals and ta...
JC - Počítačový hardware a software
- 2002 - 2004 •
- 1 177 tis. Kč •
- 399 tis. Kč •
- MŠMT
Řešení projektu: 1. 1. 2002 - 1. 1. 2004
Uznané náklady
Podpora ze státního rozpočtu (34%)
Poskytovatel: Ministerstvo školství, mládeže a tělovýchovy
A Managerial Model of Design Value for Competitiveness of SME in the Czech Republic (TL02000255)
The aim of the project is to create a methodology for measuring the benefit of design for management of SME in the Czech Republic. The aim of the project is to offer to the SME management the designed and tested me...
Business and management
- 2019 - 2020 •
- 1 993 tis. Kč •
- 1 534 tis. Kč •
- TA ČR
Řešení projektu: 1. 2. 2019 - 31. 10. 2020
Uznané náklady
Podpora ze státního rozpočtu (77%)
Poskytovatel: Technologická agentura ČR
Center of nuclear technologies - Advanced fuel cycle management methods development for VVER reactors. (FB-C3/36)
Projekct represents a development of the set of advanced methods for nuclear fuel cycle optimisation of VVER reactor types focusing on reactor physics methodology, fuel rod behaviour and in-core fuel management methods for advanced fuel ...
JF - Jaderná energetika
- 2000 - 2003 •
- 52 216 tis. Kč •
- 24 900 tis. Kč •
- MPO
Řešení projektu: 1. 1. 2000 - 1. 1. 2003
Uznané náklady
Podpora ze státního rozpočtu (48%)
Poskytovatel: Ministerstvo průmyslu a obchodu
Advanced Convergent and Easily Manageable Innovative Network Design (ACEMIND) (LF13002)
) architecture and design of advanced convergent and easily manageable hybrid networks, (2) research and development of tools for management and monitoring of hybrid networks, (3......
IN - Informatika
- 2013 - 2015 •
- 7 570 tis. Kč •
- 3 782 tis. Kč •
- MŠMT
Řešení projektu: 1. 1. 2013 - 30. 11. 2015
Uznané náklady
Podpora ze státního rozpočtu (50%)
Poskytovatel: Ministerstvo školství, mládeže a tělovýchovy
Prototype of tourism product mady by design thinking principles (UEPRKKK201412)
of principles of Destination management and design services in travel and tourismTo create database of local key development elements for further development of travel and tourism. To create prototype of tourism product made on the...
AK - Sport a aktivity volného času
- 2014 - 2014 •
- 205 tis. Kč •
- 170 tis. Kč •
- KKV
Řešení projektu: 1. 5. 2014 - 31. 10. 2014
Uznané náklady
Podpora ze státního rozpočtu (83%)
Poskytovatel: Karlovarský kraj
Effective possibilities for congestion management at highways and speed ways using ITS. (CG743-088-120)
The aim of the project is design of effective congestion traffic flow management at highways and speedways using ITS, which will reflect world experiences.......
BC - Teorie a systémy řízení
- 2007 - 2009 •
- 5 850 tis. Kč •
- 4 950 tis. Kč •
- MD
Řešení projektu: 1. 4. 2007 - 31. 12. 2009
Uznané náklady
Podpora ze státního rozpočtu (85%)
Poskytovatel: Ministerstvo dopravy
Design of control systems in water management and their optimisation (GP103/02/D049)
thanquestions of their design. The control in water management is typical by uncertainThe project is focused on the design strategy of control systems and their mathematical models in the area of water management....
JN - Stavebnictví
- 2002 - 2004 •
- 300 tis. Kč •
- 300 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2002 - 1. 1. 2004
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
- 1 - 10 out of 10 275