All
All

What are you looking for?

All
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

-
19852030

Join usingOrAnd

Join usingOrAnd

SelectAll/None
    • Show more

    • Show more

    • Show more

    • Show more

    • Show more

  • Show more

SelectAll/None

Join usingOrAnd

-

More filters

Projects

818 projects (0,108s)

Project

Bi-directional dc-dc Converters of Photovoltaic Systems with Maximum Power Tracker (GA102/09/0013)

feed-back control method to eliminate the negative fluctuation of shrinking to achieve the optimal integration of feed-back control of photovoltaic system......

JA - Elektronika a optoelektronika, elektrotechnika

  • 2009 - 2011
  • 1 618 tis. Kč
  • 1 618 tis. Kč
  • GA ČR
Project

New generation of economical pumps for power plants units of medium and large power output. (FF-P/020)

Development of pumps for large power plant units, particularly of high pressure boiler-feeding pumps, booster and back wash pumps. As the main target is reducing power consumption and weigh, reliability increase extension of mainten...

JE - Nejaderná energetika, spotřeba a užití energie

  • 2002 - 2004
  • 10 914 tis. Kč
  • 5 310 tis. Kč
  • MPO
Project

MIS and Data warehouse product inovation (UBRIF201001)

suppose transfer of informations contrariwise. Applicant will give the University feed-back about production efficiency (using this modern technologies) and its......

IN - Informatika

  • 2010 - 2011
  • 150 tis. Kč
  • 150 tis. Kč
  • KHK
Project

Pilot project for power supply of traction line with AC/AC converter (CK02000099)

protection evaluation by the inverter to the traction feed and back to the distributionThe aim of the project is to investigate the behaviour of AC/AC converters of traction supply stations that will be used in the uniform alternat...

Electrical and electronic engineering

  • 2021 - 2023
  • 15 301 tis. Kč
  • 10 596 tis. Kč
  • TA ČR
Project

We Can Play Together. Potential of Social-homogenizational Collective Music Performances (TL01000329)

on the base of participant observations, written feed-backs and in discussions...

Architectural design

  • 2018 - 2021
  • 2 091 tis. Kč
  • 1 882 tis. Kč
  • TA ČR
Project

Rationalization in control of a melt in steelworks with usage of the expert systems (GA106/02/1128)

to enhance the efficiency of the existing controlling routes and providing automatic feed-back control at least in some stages of the melting process. In addition......

JB - Senzory, čidla, měření a regulace

  • 2002 - 2004
  • 3 227 tis. Kč
  • 2 852 tis. Kč
  • GA ČR
Project

Back-school - rational approach to prevention of back pain. (IZ1540)

9F - 9

  • 1993 - 1995
  • 110 tis. Kč
  • 220 tis. Kč
  • MZ
Project

Fuel cell-based back-up power systém for telecommunications (2A-1TP1/110)

Research and development of low temperature alkaline fuel cell-based back-up power systém for telecommunications....

JE - Nejaderná energetika, spotřeba a užití energie

  • 2006 - 2009
  • 10 679 tis. Kč
  • 5 880 tis. Kč
  • MPO
Project

*Integrated také back waste management system and organized secondary raw-material market. (FI-IM2/179)

*The research and development of integrated také back waste management system and organized secondary raw-material market....

DM - Tuhý odpad a jeho kontrola, recyklace

  • 2005 - 2006
  • 9 197 tis. Kč
  • 2 282 tis. Kč
  • MPO
Project

Piggy-back technique in liver transplantation (ND4649)

The subject of the investigation is to verify the feasibility of the piggy-back technique in the liver transplantation and to compare the results with the conventional technique.......

FJ - Chirurgie včetně transplantologie

  • 1998 - 2000
  • 1 272 tis. Kč
  • 1 164 tis. Kč
  • MZ
  • 1 - 10 out of 818