Filters
Dynamic clustering for control of complex processes (IBS1075351)
The project aims at - continuation of research of fully probabilistic design of advisory systems for control of complex processes based on probabilistic clustering, - modification of the methodology of design
BC - Teorie a systémy řízení
- 2003 - 2005 •
- 2 395 tis. Kč •
- 1 805 tis. Kč •
- AV ČR
Řešení projektu: 1. 1. 2003 - 1. 1. 2005
Uznané náklady
Podpora ze státního rozpočtu (75%)
Poskytovatel: Akademie věd České republiky
Application of the qualitatively new probabilistic method SBRA (Simulation-Based Reliability Assessment) to evaluate the reliability of structures for civil and mechanical engineering and its (LH11073)
enable a qualitative shift in the thinking of the designers, from ?deterministic? or ?semi-probabilistic? to a complex ?fully probabilistic? thinking. This shift (a fully adequate shift in the computer er...
JM - Inženýrské stavitelství
- 2011 - 2014 •
- 446 tis. Kč •
- 446 tis. Kč •
- MŠMT
Řešení projektu: 1. 3. 2011 - 31. 12. 2014
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo školství, mládeže a tělovýchovy
Fully probabilistic design of adaptive decision-making strategies suitable under informationally demanding conditions (2C06001)
making via fully probabilistic methodology that describes both the subject and aims of decision making in probabilistic terms; ii) by designing approximation methodology......
BB - Aplikovaná statistika, operační výzkum
- 2006 - 2009 •
- 10 977 tis. Kč •
- 8 221 tis. Kč •
- MŠMT
Řešení projektu: 1. 7. 2006 - 31. 12. 2009
Uznané náklady
Podpora ze státního rozpočtu (75%)
Poskytovatel: Ministerstvo školství, mládeže a tělovýchovy
Fully probabilistic design of dynamic decision strategies (GA102/08/0567)
on distributed DM and fully probabilistic design (FPD) of strategies. The project aimsat-specific elements on probabilistic distributions (pd). 3) Methodology of the DM of conditions leading to FPD2. Extension of ...
BD - Teorie informace
- 2008 - 2011 •
- 4 726 tis. Kč •
- 4 726 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2008 - 31. 12. 2011
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Optimal Distributional Design for External Stochastic Knowledge Processing (GA18-15970S)
methods are used for such distributed decision making, extended as Fully Probabilistic Design (FPD) in recent years. Restrictive modelling assumptions - which assume nodes exploration of the design space, and equi...
Statistics and probability
- 2018 - 2021 •
- 4 258 tis. Kč •
- 4 063 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2018 - 31. 12. 2021
Uznané náklady
Podpora ze státního rozpočtu (95%)
Poskytovatel: Grantová agentura České republiky
Fully Probabilistic Design of Dynamic Decision Strategies for Imperfect Participants in Market Scenarios (GA13-13502S)
. The support will employ fully probabilistic design (FPD, a generalisation of Bayesian DM approximate learning and design of DM strategies.......
AH - Ekonomie
- 2013 - 2016 •
- 5 792 tis. Kč •
- 5 792 tis. Kč •
- GA ČR
Řešení projektu: 1. 2. 2013 - 31. 12. 2016
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Fire resistance of glued laminated timber beams including uncertainties (GA18-05791S)
covers the fully probabilistic approach to the failure probability of structuralAn important issue in the safety and reliability design of timber structures is the prediction of their performance when subjected to a fire. ...
Civil engineering
- 2018 - 2022 •
- 4 583 tis. Kč •
- 4 502 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2018 - 31. 12. 2022
Uznané náklady
Podpora ze státního rozpočtu (98%)
Poskytovatel: Grantová agentura České republiky
Uncertainty modelling in safety formats of concrete structures (GA20-01781S)
will be verified by a fully probabilistic approach. In cooperation with international research organisations, research outcomes will be utilised in Eurocodes for structural designDesign assisted by numerical simul...
Civil engineering
- 2020 - 2022 •
- 7 731 tis. Kč •
- 7 305 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2020 - 31. 12. 2022
Uznané náklady
Podpora ze státního rozpočtu (94%)
Poskytovatel: Grantová agentura České republiky
Structural reliability assesment based on the application of simulation technique and on the increasing potential of computer technology and information freeway (GA103/98/0215)
representation of loads and ending with fully probabilistic 3ssessment of the reliabilityThe current structural reliability assessment methods (such as Allowable Stress Design and Partial Factor: Method) were developed in ...
JN - Stavebnictví
- 1998 - 2000 •
- 2 647 tis. Kč •
- 2 155 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1998 - 1. 1. 2000
Uznané náklady
Podpora ze státního rozpočtu (81%)
Poskytovatel: Grantová agentura České republiky
Reliability analysis of structures exposed to exceptional action (GD103/05/H036)
using common partial safety factor method and fully probabilistic method SBRA. Fully probabilistic methods are the object of high interest currently.......
JM - Inženýrské stavitelství
- 2005 - 2008 •
- 2 892 tis. Kč •
- 2 892 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2005 - 31. 12. 2008
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
- 1 - 10 out of 8 254