Filters
Groundwater quantitative and chemical status assessment (SA/650/1/01)
Background design for the implementation of requirements of Framework Directive in the field of water policy to assess quantitative and chemical status of groundwater bodies, including relation between groundwater and ecological and...
DJ - Znečištění a kontrola vody
- 2001 - 2003 •
- 14 236 tis. Kč •
- 10 790 tis. Kč •
- MŽP
Řešení projektu: 1. 1. 2001 - 1. 1. 2003
Uznané náklady
Podpora ze státního rozpočtu (76%)
Poskytovatel: Ministerstvo životního prostředí
Integration of Advanced Methods for the Management of Groundwater at Risk in Drinking Water Catchment Areas (MADWICA) (OE117)
Development and application of integrated tool (Decision Support System - DSS) for management of groundwater resources. This tool enables 3D interpretation of geological and hydrogeological data, contamination risk assessment and supports de...
DJ - Znečištění a kontrola vody
- 2002 - 2004 •
- 4 057 tis. Kč •
- 1 774 tis. Kč •
- MŠMT
Řešení projektu: 1. 1. 2002 - 1. 1. 2004
Uznané náklady
Podpora ze státního rozpočtu (44%)
Poskytovatel: Ministerstvo školství, mládeže a tělovýchovy
Targeted replenishment of groundwater as a tool to reduce drought impact in the Czech Republic (SS01010208)
The main objective of the project is a change in groundwater management from of using free volumes in aquifers to increase groundwater resources in the landscape. The project also aims at better integration of groundwater a...
Water resources
- 2020 - 2023 •
- 12 640 tis. Kč •
- 12 640 tis. Kč •
- TA ČR
Řešení projektu: 1. 4. 2020 - 31. 3. 2023
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Technologická agentura ČR
Impacts of climate change on minimum residual flows in the Jizera River network and groundwater withdrawals near the stream. (SQ01010176)
The project will predict climate change's impact on the river network's water flow and groundwater resources. The sustainability of groundwater extractions basin as an example. The hydraulic connections between the groundwater
Water resources
- 2025 - 2028 •
- 14 240 tis. Kč •
- 11 725 tis. Kč •
- TA ČR
Řešení projektu: 1. 3. 2025 - 29. 2. 2028
Uznané náklady
Podpora ze státního rozpočtu (82%)
Poskytovatel: Technologická agentura ČR
Modelling influence of climatological changes on groundwater regime (GA103/96/1327)
Climatological changes are the main cause of the groundwater regime of groundwater on the basis of the analysis of climatological influences on the groundwater regimes of the groundwater tanking. Practical applicat...
DA - Hydrologie a limnologie
- 1996 - 1998 •
- 1 670 tis. Kč •
- 746 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1996 - 1. 1. 1998
Uznané náklady
Podpora ze státního rozpočtu (45%)
Poskytovatel: Grantová agentura České republiky
Modelling of tidal effects in groundwater hydraulics (GA205/07/1311)
Groundwater level fluctuations due to earth tides have been observed since 19th been developed to assess the mechanisms of tidal influence on groundwater behaviour. The observed changes in groundwater level are of periodic ...
BK - Mechanika tekutin
- 2007 - 2009 •
- 939 tis. Kč •
- 939 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2007 - 31. 12. 2009
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Innovation and application of circulation wells in contaminated geology (TA02021263)
Proposed project belongs to the area of development remediation technologies for removal of groundwater contamination. In the framework of the project, innovative Groundwater Circulation Well (GCW) technologies and promarily technol...
DK - Kontaminace a dekontaminace půdy včetně pesticidů
- 2012 - 2015 •
- 12 530 tis. Kč •
- 7 168 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2012 - 31. 12. 2015
Uznané náklady
Podpora ze státního rozpočtu (57%)
Poskytovatel: Technologická agentura ČR
The "water/rock/landscape" system interaction principles and its application in groundwater protection in the Czech Republic (SP/2E1/153/07)
1 ? Explanation of ?water/rock/landscape? interplay in selected regions containing significant groundwater sources, 2 ? Geological knowledge update of groundwater body chemical state limits, 5 ? Compilation and testing of hydrogeolo...
DA - Hydrologie a limnologie
- 2007 - 2011 •
- 20 736 tis. Kč •
- 19 302 tis. Kč •
- MŽP
Řešení projektu: 1. 8. 2007 - 31. 12. 2011
Uznané náklady
Podpora ze státního rozpočtu (93%)
Poskytovatel: Ministerstvo životního prostředí
New technologies and materials for groundwater treatment on basis of biogeochemical processes (BIOGEOCHEM) (TH01030851)
Reseach of methods for groundwater remediation based on biogeochemical transformation of chlorinated and petroleum hydrocarbons. Research of new materials for stimulation of contaminant degradation in groundwater and wastewater. Pos...
DJ - Znečištění a kontrola vody
- 2015 - 2018 •
- 10 303 tis. Kč •
- 7 395 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2015 - 30. 6. 2018
Uznané náklady
Podpora ze státního rozpočtu (72%)
Poskytovatel: Technologická agentura ČR
ALert system In Case of Excess withdrawal or rise up of groundwater in the sensitive areas (LF14011)
The project ALICE deals with the development of an alert system that warns of extreme groundwater-level declines or rises in areas that are directly dependent on steady-state groundwater level. This system will be based on sensing t...
JB - Senzory, čidla, měření a regulace
- 2014 - 2016 •
- 7 620 tis. Kč •
- 3 810 tis. Kč •
- MŠMT
Řešení projektu: 1. 4. 2014 - 31. 12. 2016
Uznané náklady
Podpora ze státního rozpočtu (50%)
Poskytovatel: Ministerstvo školství, mládeže a tělovýchovy
- 1 - 10 out of 186