All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

413 (0,086s)

Project

Experimental lifetime testing of tram gearboxes up to power 150kW. (FR-TI3/261)

The project deals with the development of testing stand, shortened lifetime test procedure and testing procedure to experimental testing of tram drive gearboxes lifetime. The project deals with recherche of testing, design, solution...

JO - Pozemní dopravní systémy a zařízení

  • 2011 - 2013
  • 6 252 tis. Kč
  • 3 755 tis. Kč
  • MPO
Project

Research of effects affecting lifetime of moulding instruments (EG15_019/0004850)

Research of effects affecting lifetime of moulding instruments...

JQ - Strojní zařízení a nástroje

  • 2015 - 2020
  • 3 333 tis. Kč
  • 0 tis. Kč
  • MPO
Project

Time dependence of corrosion process and lifetime prediction problems of reinforced concrete and pre-stressed concrete structures (CE803120107)

Unification of procedure at estimation of lifetime is evocated needs of maximized rationalisation and effectiveness of exercised substances on determination project aim is prescription elaboration (TP MDS) for uniform estimation lifetime...

JO - Pozemní dopravní systémy a zařízení

  • 2001 - 2003
  • 3 143 tis. Kč
  • 3 143 tis. Kč
  • MD
Project

Application Acoustic Emission of the Methods for Determinations Lifetime for Pipe - Lines and Pressure Vessels (TC3-86)

Application Acoustic Emission of the Methods for Determinations Lifetime for Pipe - Lines and Pressure Vessels...

JB - Senzory, čidla, měření a regulace

  • 1997 - 1999
  • 10 465 tis. Kč
  • 5 000 tis. Kč
  • MH
Project

Changes of rubber lining quality and monitoring methods due to service-life. (FT-TA4/095)

describe changing of properties, during these lifetime and the suggest of process leading to improveon prediction of lifetime on the base of laboratory and industry prediction of lifetime data.......

JK - Koroze a povrchové úpravy materiálu

  • 2007 - 2010
  • 12 830 tis. Kč
  • 8 981 tis. Kč
  • MPO
Project

Inspection and Lifetime Assessment Tool for Arch Structures (7D10002)

Historical and even new arch bridges all over Europe supporting road and railway structures are not designed for currently required EN-load combinations. The objective of this project is the development of a monitoring and numerical based reliability...

JM - Inženýrské stavitelství

  • 2010 - 2012
  • 3 746 tis. Kč
  • 1 873 tis. Kč
  • MŠMT
Project

ASSESSMENT OF THE RESIDUAL LIFETIME OF THE MAIN STRUCTURAL PARTS OF THE BRIDGES PRODUCED OF WEATHERED STEEL MATERIALS. (1F82C/012/910)

Using the methodology developed by the author, the Project analyses a residual lifetime of steel structures deteriorated by the corrosion. The project analyses location of the structures in corrosive environment, influence of the microclimat...

JO - Pozemní dopravní systémy a zařízení

  • 2008 - 2009
  • 3 500 tis. Kč
  • 2 960 tis. Kč
  • MD
Project

Novel plasmonic biosensing nanostructures characterised by time resolved surface enhanced fluorescence (8J18FR006)

• Characterisation of biosensing plasmonic nanostructures based on lifetime study • Design optimization of well characterized, easy to prepare, efficient enhancement and low cost biosensing plasmonic nanostructures • Possible further extensi...

Optics (including laser optics and quantum optics)

  • 2018 - 2019
  • 108 tis. Kč
  • 0 tis. Kč
  • MŠMT
Project

Lifetime increasing of military technique components by micropulse plazma nitridation process (MO47170898123)

Veryfy of plasma nitridation technology on mechanical materials and its asses for substantial reduction of degradation effect on part lifetime.......

JK - Koroze a povrchové úpravy materiálu

  • 1998 - 2000
  • 3 412 tis. Kč
  • 2 712 tis. Kč
  • MO
Project

Relating the environmental footprint of a vehicle to the lifetime costs of maintaining the infrastructure (OE 197)

decreasing of damaging effects of lorries; clarification of dynamicinteractions between vehicles and infrastructure...

JO - Pozemní dopravní systémy a zařízení

  • 2006 - 2008
  • 12 806 tis. Kč
  • 6 076 tis. Kč
  • MŠMT
  • 1 - 10 out of 413