Filters
Stability analysis of cable stayed and suspension bridges (GA103/08/1700)
Suspension and cable stayed bridges are frequent in civil engineering they sometimes suffer form certain instabilities especially in wind. The main goal of this project isto formulate complex models of cable stayed and susp...
JM - Inženýrské stavitelství
- 2008 - 2010 •
- 888 tis. Kč •
- 888 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2008 - 31. 12. 2010
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Technology and method of controlling the adhesion of materials during the production process of power cables (TS02020049)
The main objective of the project is the research and development of low voltage power cables up to 1000 V with requirements for a guaranteed level of adhesion of the insulating material to the metallic cores. As part of the project...
Energy and fuels
- 2025 - 2027 •
- 15 986 tis. Kč •
- 9 593 tis. Kč •
- TA ČR
Řešení projektu: 1. 6. 2025 - 31. 12. 2027
Uznané náklady
Podpora ze státního rozpočtu (60%)
Poskytovatel: Technologická agentura ČR
Energetic cable with added sensors to measure working parameters along the cable length on IoT principle to optimize transferred power and energetic loses (TK03020196)
The main target is to add to energy cable ability to communicate of the cable, i.e. inner temperature, vibration level, etc. Particular targets are: 1 to integrate ot to the cable construction 2. Apply suitable te...
Energy and fuels
- 2020 - 2022 •
- 16 622 tis. Kč •
- 9 898 tis. Kč •
- TA ČR
Řešení projektu: 1. 7. 2020 - 31. 12. 2022
Uznané náklady
Podpora ze státního rozpočtu (60%)
Poskytovatel: Technologická agentura ČR
Power distribution cables with integrated cooling and heat distribution system for energy recovery (TK05020190)
The main objective of the project is the research and development of a hybrid (multifunctional) low voltage cable up to 1000 V for electric power distribution. This means, for example, using the waste heat of the cable and ...
Energy and fuels
- 2023 - 2025 •
- 10 223 tis. Kč •
- 6 099 tis. Kč •
- TA ČR
Řešení projektu: 1. 2. 2023 - 31. 12. 2025
Uznané náklady
Podpora ze státního rozpočtu (60%)
Poskytovatel: Technologická agentura ČR
Fiber optic elements with new standards for optical connectors for safety-intensive applications (FW06010161)
the properties of optical cables to achieve the PRO3 and OVT results. The main goal is to produce a prototype PRO3 and OVT, which is a new type of optical cable designed of measuring 16 channel workplace), PRO3 (Prototype ...
Optics (including laser optics and quantum optics)
- 2023 - 2025 •
- 14 126 tis. Kč •
- 9 380 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2023 - 31. 12. 2025
Uznané náklady
Podpora ze státního rozpočtu (66%)
Poskytovatel: Technologická agentura ČR
Ljmits for broad-band signal transmmision on the twisted pairs and other systém co-existence (GA102/03/0434)
The main objective of this project is to carry out a study work and analysis on a cable electrical unbalances and effects they might have on a induced crosstalk levels in a cable proposing provisions for reducing influence ...
JA - Elektronika a optoelektronika, elektrotechnika
- 2003 - 2005 •
- 4 516 tis. Kč •
- 4 245 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2003 - 1. 1. 2005
Uznané náklady
Podpora ze státního rozpočtu (94%)
Poskytovatel: Grantová agentura České republiky
Development of predictive diagnostic system for equipments of electrical substations (TK04020068)
The main goal of the project is to create the optimal system with sensors, power supply and communication system, which will be used for signaling faults in electrical substations and their diagnostics with a focus on MV cables. The...
Energy and fuels
- 2022 - 2025 •
- 30 915 tis. Kč •
- 18 544 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2022 - 30. 6. 2025
Uznané náklady
Podpora ze státního rozpočtu (60%)
Poskytovatel: Technologická agentura ČR
Development of optical cables for use in special applications and in extreme conditions (TK05020031)
The aim of the project is to implement two prototypes of optical cables (PRO1 and PRO2) and two proven production technologies for these optical cables (OVT1 and OVT2). The project results in completely new optical cable de...
Nuclear related engineering; (nuclear physics to be 1.3);
- 2023 - 2025 •
- 17 871 tis. Kč •
- 10 635 tis. Kč •
- TA ČR
Řešení projektu: 1. 2. 2023 - 31. 12. 2025
Uznané náklady
Podpora ze státního rozpočtu (60%)
Poskytovatel: Technologická agentura ČR
Forest Cable Yarder Larix Hydro. (FA-E2/007)
Research, development and production cable system Larix Hydro with aim to increased export of cable systems in 2001 - 2004 years....
JR - Ostatní strojírenství
- 1999 - 2001 •
- 7 644 tis. Kč •
- 2 995 tis. Kč •
- MPO
Řešení projektu: 1. 1. 1999 - 1. 1. 2001
Uznané náklady
Podpora ze státního rozpočtu (39%)
Poskytovatel: Ministerstvo průmyslu a obchodu
Halogen-free safety electrical cables meeting the requirements of LOCA of the latest types of nuclear power plants and the latest requirements for fire safety according to European and national (TK05020036)
The main target is to develop power and communication cables, to be used for reconstruction or construction of new nuclear power plant units, that means cables resistant to ionizing radiation and fulfilling safety requireme...
Nuclear related engineering; (nuclear physics to be 1.3);
- 2023 - 2025 •
- 17 975 tis. Kč •
- 10 540 tis. Kč •
- TA ČR
Řešení projektu: 1. 2. 2023 - 31. 12. 2025
Uznané náklady
Podpora ze státního rozpočtu (59%)
Poskytovatel: Technologická agentura ČR
- 1 - 10 out of 8 604