All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

3 762 (0,078s)

Project

System for assistance in decision-making processes for planning of major maintenance and investments to the road network. (CG723-061-120)

System for assistance in decision-making processes for planning of major maintenance and investments to the road network....

JO - Pozemní dopravní systémy a zařízení

  • 2007 - 2009
  • 1 585 tis. Kč
  • 1 344 tis. Kč
  • MD
Project

Improving effectiveness of aircraft maintenance planning and execution (CK01000204)

maintenance planning and execution with consequent improvement of air transport and dependencies, which determine the course of aircraft maintenance, and improvement of accuracy of the aircraft maintenance and rep...

Automation and control systems

  • 2020 - 2023
  • 9 678 tis. Kč
  • 7 486 tis. Kč
  • TA ČR
Project

Production devices effectiveness improvement on oxygen steelworks by optimization of technical maintenance (GP106/02/P045)

is a minimization of downtimes due to planned or non-planned maintenance. The aim devices.Such interpreted model of the technical preventive maintenance will utilize a system of recommendations for dependability a...

JS - Řízení spolehlivosti a kvality, zkušebnictví

  • 2002 - 2004
  • 519 tis. Kč
  • 519 tis. Kč
  • GA ČR
Project

Application of the modern maintenance concepts and prognostics systems to the live cycle costs (LCC) reduction trough the availability and maintenance optimalization (DIAGCYCLUS) (OPLOM20060003)

Realization of the methodology a programs tools for complex diagnostic analysis existing and new maintenance concepts (technologies) on the existing and new aircraft generation for the Live cycle cost (LCC) improvement (decreasing) on the ba...

KA - Vojenství

  • 2006 - 2008
  • 5 551 tis. Kč
  • 5 551 tis. Kč
  • MO
Project

Research and development of an information system for decision making in the area of reliability and service maintenance optimization of steam turbines and selected equipment of power turbine halls (FR-TI1/258)

system prototype of sophisticated effective control and planning benefit in steam turbine and turbine halls selected equipment service maintenance area. It will be created thecomplex database, simulation and computational tool for ...

JS - Řízení spolehlivosti a kvality, zkušebnictví

  • 2009 - 2013
  • 15 400 tis. Kč
  • 11 780 tis. Kč
  • MPO
Project

Modification of ?Methodology of forest management planning of structurally rich forests? and application this Methodology in three basic types of production forest ownership (SP/2D3/17/08)

The aim of the project is to develop such forest management planning procedures for production forests that future nature-oriented maintenance can rest on. Part of the project will be to work up the guidelines for no-coupe nature-or...

GK - Lesnictví

  • 2008 - 2010
  • 4 112 tis. Kč
  • 3 956 tis. Kč
  • MŽP
Project

Exploitation of Modern Methods of Operative Control for Rationalization of Metallurgical Aggregates Maintenance (GP106/03/P159)

planning system with process maintenance integration, with exploitation of knowledge in the framework of operative production and maintenance plan of the system will be further aggregates and to facilitate interco...

JS - Řízení spolehlivosti a kvality, zkušebnictví

  • 2003 - 2005
  • 534 tis. Kč
  • 534 tis. Kč
  • GA ČR
Project

System for predictive maintenance of CNC machines (EG21_374/0026885)

The main goal of the project is research and development of a comprehensive solution for prediction and elimination of errors in the production process of CNC machines and better planning of their maintenance in order to increase th...

Automation and control systems

  • 2021 - 2023
  • 19 062 tis. Kč
  • 0 tis. Kč
  • MPO
Project

The research of new methods of solving the reliability of electric distribution systems with regard to asset management planning (GA102/03/1539)

The submitted study will be concerned with the relation between reliability and maintenance. The main goal is the determination of optimum maintenance distributionsystems. In the comprehensive conception it is the case of optimal

JE - Nejaderná energetika, spotřeba a užití energie

  • 2003 - 2005
  • 665 tis. Kč
  • 665 tis. Kč
  • GA ČR
Project

Predictive vehicle maintenance (CK01000060)

This project aims to create a pilot system for predictive vehicle maintenance, including: -Analysis and creation of advanced tools for supply chain and work force optimization, and design the tools for planning services and HR -New ...

Applied mathematics

  • 2020 - 2022
  • 6 063 tis. Kč
  • 4 826 tis. Kč
  • TA ČR
  • 1 - 10 out of 3 762