All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

463 (0,061s)

Project

AM 50 Bridge-laying Automobile (70 t) (ORVTUPV200504)

The aim of the project is to develop the "AM 50 Bridge-laying Automobile (70 t)", which is intended for building a set of four identical bridge-laying automobiles with the ability to set up a mechanised bridge on f...

KA - Vojenství

  • 2005 - 2008
  • 82 856 tis. Kč
  • 82 856 tis. Kč
  • MO
Project

Technology of production of bare-rooted broad-leaved saplings in forest nurseries and the use of this special planting stock in forest regeneration (QJ1220331)

-quality root systems achieved by intensive mechanised root pruning and make the mechanised way of planting the new-generation saplings on forest sites and compare the mechanised and manual planting of this large-sized plan...

GK - Lesnictví

  • 2012 - 2016
  • 14 539 tis. Kč
  • 8 970 tis. Kč
  • MZe
Project

Thermohydraulic model of the Nuclear Power Plant Unit development for the independent accident analysis corried out by RELAP5 code (JB8/99)

Development of methods and tools including a test model block and technical justification for in-service inspection qualification of critical WWER 440 type NPP primary circuit components focused on mechanised UT examinations of reactor press...

JF - Jaderná energetika

  • 1999 - 2000
  • 5 000 tis. Kč
  • 5 000 tis. Kč
  • SÚJB
Project

Establishement and management of pond dykes growths with respect to their utilisation (QJ1220029)

mechanisation devices and technological lines for dyke treatments....

DO - Ochrana krajinných území

  • 2012 - 2016
  • 14 003 tis. Kč
  • 9 242 tis. Kč
  • MZe
Project

Fixed joint of pontoon bridge set and ribbon bridge. (MO03171100008)

Design of a fixed joint of two different floating bridge systems - pontoon bridge set and ribbon bridge....

KA - Vojenství

  • 2000 - 2001
  • 869 tis. Kč
  • 869 tis. Kč
  • MO
Project

OMO-bridge (EG16_083/0010342)

OMO-bridge...

JG - Hutnictví, kovové materiály

  • 2017 - 2020
  • 1 820 tis. Kč
  • 0 tis. Kč
  • MPO
Project

Concrete pavements on bridges (CE803120124)

The main target of this research project is designed and discussed technological specifications (TP MDS ČR) for concrete pavements on bridges and reccomend new on bridges in this TP MDS ČR and also requirments for characteristics an...

JO - Pozemní dopravní systémy a zařízení

  • 2001 - 2003
  • 2 380 tis. Kč
  • 2 380 tis. Kč
  • MD
Project

Advanced Modular Cloud Computing System for Bridge Infrastructure Monitoring Utilizing Fibre Optics (CK03000219)

for long-term monitoring of bridge structures with a focus on reinforced concrete and prestressed bridges, whose primary objective is to detect possible damage to the structure that will be able to learn and evaluate data based on ...

Construction engineering, Municipal and structural engineering

  • 2022 - 2024
  • 30 962 tis. Kč
  • 23 949 tis. Kč
  • TA ČR
Project

Bridge management system (CE803120113)

Complex system of bridge management....

JO - Pozemní dopravní systémy a zařízení

  • 2001 - 2003
  • 2 714 tis. Kč
  • 2 714 tis. Kč
  • MD
Project

Modular system of bridge constructions made of advanced composite materials (TA02010501)

Project deals with development of modular system of bridge constructions made of composites. These constructions will find the applicability as footbridges above roads or railways and between buildings, maintenance bridges, or tempo...

JI - Kompositní materiály

  • 2012 - 2015
  • 15 444 tis. Kč
  • 9 652 tis. Kč
  • TA ČR
  • 1 - 10 out of 463