Filters
Research on innovative methods of mining stocks bound in coal mines (TB030CBU001)
. conditions, b) in conditions of reverse slopes of brown coal open mines - concentrated) and technological and technical solution of the open mine (in conditions of reverse slopes of brown coal open m...
JG - Hutnictví, kovové materiály
- 2015 - 2016 •
- 5 500 tis. Kč •
- 5 500 tis. Kč •
- TA ČR
Řešení projektu: 1. 8. 2015 - 31. 12. 2016
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Technologická agentura ČR
Development of a method of earth surface change monitoring in the region with extensive ground and open mining activities of raw material resources (GA205/01/0982)
The aim of the proposed project is to create a geo-dynamic model of a region in the North Bohemia Brown Coal Basin. At first ground coal mining and open-cast brown coal mining was performed here later on. Detailed documenta...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 2001 - 2003 •
- 803 tis. Kč •
- 597 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2001 - 1. 1. 2003
Uznané náklady
Podpora ze státního rozpočtu (74%)
Poskytovatel: Grantová agentura České republiky
The aspects of safe performance of the underground mining openings in the depth over 800 m (VG20102014034)
The main objective of the project is to increase the safety of underground mining and the miners by the use of new technologies, knowledge and other outcomes of applied research in the field of prevention of natural and industrial accidents....
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 2010 - 2014 •
- 14 681 tis. Kč •
- 12 327 tis. Kč •
- MV
Řešení projektu: 1. 10. 2010 - 30. 9. 2014
Uznané náklady
Podpora ze státního rozpočtu (84%)
Poskytovatel: Ministerstvo vnitra
Realization of underground openings in the zones influenced by aditional stresses in the vinicity of protective pillars of mine shafts and crosscuts in the rockburst prone mines. (AACBU22-03)
Mining activities in the zones influenced by additional stresses induced by protective pillars of mine shafts and crosscuts are usually endangered by higher rockbursts risk in the rockburts prone mines. The target of the so...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 2003 - 2005 •
- 3 600 tis. Kč •
- 3 600 tis. Kč •
- ČBÚ
Řešení projektu: 1. 1. 2003 - 1. 1. 2005
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Český báňský úřad
The research of regularities and prediction methods of long-term stability of unsupported mining and underground openings. (GA105/93/0016)
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 1993 - 1994 •
- 0 tis. Kč •
- 0 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1993 - 1. 1. 1994
Uznané náklady
Podpora ze státního rozpočtu
Poskytovatel: Grantová agentura České republiky
Archaeology of a disappearing landscape. A non-destructive survey of the open-cast mine Tušimice (GA404/07/0989)
Up to the present day, open-cast mining in NW Bohemia has swallowed more than 350 sq. km of cultural landscape. Numerous excavations were undertaken but usually only when the topsoil layer had already been removed. Under such condit...
AC - Archeologie, antropologie, etnologie
- 2007 - 2009 •
- 1 543 tis. Kč •
- 1 543 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2007 - 31. 12. 2009
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Updating of the tilt monitoring system in the hazardous environment of the ČSA open-pit-mine, Most. Second stage. (IBS3012353)
control the stability of the Krušné hory Mts. steep slopes at the edge of the ČSA open-pit coal mine. The new station showed significant tilt movement of the steep slope of the massif. Such results are of major importance for the <...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 2003 - 2005 •
- 1 408 tis. Kč •
- 838 tis. Kč •
- AV ČR
Řešení projektu: 1. 1. 2003 - 1. 1. 2005
Uznané náklady
Podpora ze státního rozpočtu (60%)
Poskytovatel: Akademie věd České republiky
Undergoing and threatened significant mineralogical localities of Bohemia, their documentation and investigation (RK99P03OMG008)
Contemporaneously with decreasing interest in local deposits the mines, strip mines and quarries are decommissioned and the leftovers of mining activities cleanen mineralogical localities are open for collecting te...
DB - Geologie a mineralogie
- 1999 - 2001 •
- 340 tis. Kč •
- 205 tis. Kč •
- MK
Řešení projektu: 1. 1. 1999 - 1. 1. 2001
Uznané náklady
Podpora ze státního rozpočtu (60%)
Poskytovatel: Ministerstvo kultury
Updating of the tilt monitoring system in the hazardous environment of the ČSA mine, Most. (IBS3012008)
to the active open-pit mine. The threatened Castle Jezeří is also located just above of the ope-pit mine ČSA in Most. From this reason we propose to establsh a new in order to provide both the client (Mine comp.) ...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 2000 - 2002 •
- 3 572 tis. Kč •
- 800 tis. Kč •
- AV ČR
Řešení projektu: 1. 1. 2000 - 1. 1. 2002
Uznané náklady
Podpora ze státního rozpočtu (22%)
Poskytovatel: Akademie věd České republiky
Research of Possibility Long Term for the Elimination of Mining Risks in Horní Benešov and Horní Město Mining Districts (GA105/07/1358)
and the problems of open exploitation rooms, mining waters, dumps and tailing ponds Benešov and Horní Město ore districts. The mining operations, mainly of polymetallic the technical and ecological points. The research wi...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 2007 - 2009 •
- 2 900 tis. Kč •
- 2 900 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2007 - 31. 12. 2009
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
- 1 - 10 out of 2 293