All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

3 249 (0,125s)

Project

System for predictive maintenance of CNC machines (EG21_374/0026885)

solution for prediction and elimination of errors in the production process of CNC machines and better planning of their maintenance in order to increase the efficiency: 1) SW tool for data collection and evaluation with predi...

Automation and control systems

  • 2021 - 2023
  • 19 062 tis. Kč
  • 0 tis. Kč
  • MPO
Project

IDMAN - Intelligent diagnostic system for rail vehicles. (FT-TA3/025)

Research and development of intelligent system for energy savings and for predictive maintenance of rail vehicles....

JA - Elektronika a optoelektronika, elektrotechnika

  • 2006 - 2009
  • 31 539 tis. Kč
  • 19 888 tis. Kč
  • MPO
Project

Development of a prototype of a predictive maintenance system for Industry 4.0 in the company ELEBRO CZ s.r.o. (EG21_374/0026907)

for the implementation of Predictive Maintenance and Predictive Production Quality processes for the implementation of industrial data analysis for the needs of predictive maintenance, where continuous

Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)

  • 2022 - 2024
  • 12 404 tis. Kč
  • 0 tis. Kč
  • MPO
Project

SUstainable PREdictive Maintenance for manufacturing Equipment (7E13027)

to predictive maintenance and energy consumption reduction - to implement these tools in an industrial demonstrator - to develop, exploit and diffuse new tools for predictive maintenance SUPREME?s main challenging...

IN - Informatika

  • 2013 - 2015
  • 1 648 tis. Kč
  • 1 648 tis. Kč
  • MŠMT
Project

Implementation of diagnostic and predictive maintenance for efficient control of photovoltaic powerplants using autonomous vehicles (TK03020144)

of a prototype system for predictive maintenance of a photovoltaic powerplant capable the operation time of PP. The system is able to predict module failure and evaluate influence of this failure on the power production of...

Energy and fuels

  • 2020 - 2024
  • 35 928 tis. Kč
  • 19 199 tis. Kč
  • TA ČR
Project

Maintenance management information system with benchmarking module respecting Industry 4.0 (FV20286)

, the system will support predictive maintenance and intelligent services using advanced data analysis methods for process and maintenance optimization. In addition, the system will be supplemented by the module 'Mainte...

IN - Informatika

  • 2017 - 2020
  • 17 210 tis. Kč
  • 12 824 tis. Kč
  • MPO
Project

Improving effectiveness of aircraft maintenance planning and execution (CK01000204)

maintenance planning and execution with consequent improvement of air transport and dependencies, which determine the course of aircraft maintenance, and improvement of accuracy of the aircraft maintenance and repair proce...

Automation and control systems

  • 2020 - 2023
  • 9 678 tis. Kč
  • 7 486 tis. Kč
  • TA ČR
Project

Predictive vehicle maintenance (CK01000060)

This project aims to create a pilot system for predictive vehicle maintenance, including: -Analysis and creation of advanced tools for supply chain and work force breakage prediction -Recomendation for design of SW for disp...

Applied mathematics

  • 2020 - 2022
  • 6 063 tis. Kč
  • 4 826 tis. Kč
  • TA ČR
Project

Predictive maintenance of the rail traffic routes (CK02000177)

The aim of the project is the development of new technology for predictive track maintenance, which will lead to a significant extension of the life cycle of such treated sections of the track. A new procedure for the creation of fu...

Transport engineering

  • 2021 - 2024
  • 25 956 tis. Kč
  • 20 368 tis. Kč
  • TA ČR
Project

5GRailCare Innovative Remote 5G Management of Railway Rolling Stock According to ECM Standard with Predictive Maintenance Estimation (CL02000139)

diagnostics with real-time data transmission for efficient repairs and maintenance. A predictive model will be created for estimating the remaining lifespan of individual data management within ECM (Charge of Maintenance) ...

Communication engineering and systems

  • 2025 - 2027
  • 21 661 tis. Kč
  • 13 294 tis. Kč
  • TA ČR
  • 1 - 10 out of 3 249