All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

1 771 (0,107s)

Project

Standardized prcedures of specification and evaluation of military technology reliability in the course of acquisition in scope of the Ministry of defense. (MO83171199108)

Problems of reliability requerments specification in the case of militara technology especially combat and transpor vehicles and solves possibilities of individual reliability indicators verification.......

KA - Vojenství

  • 1999 - 2000
  • 242 tis. Kč
  • 242 tis. Kč
  • MO
Project

Increasing the Screw Compressors Reliability (EG15_019/0004846)

Increasing the Screw Compressors Reliability...

JQ - Strojní zařízení a nástroje

  • 2015 - 2020
  • 10 400 tis. Kč
  • 1 833 tis. Kč
  • MPO
Project

Examination of methods of evaluating the reliability of electric high-voltage switch gears (GA102/99/1158)

In its part, the project proposes an analysis of reliability of a common system. The modelling of system reliability behaviour will include primarily the structural reliability analysis, i.e. the following two activities: T...

JE - Nejaderná energetika, spotřeba a užití energie

  • 1999 - 2001
  • 475 tis. Kč
  • 475 tis. Kč
  • GA ČR
Project

Inverse structural reliability problems (GAP105/11/1385)

reliability problem - the problem to find designparameters corresponding to specified reliability levels expressed byreliability indexes or by theoretical failure probabilities ofrandom design variable. A new general approach of th...

JN - Stavebnictví

  • 2011 - 2013
  • 2 979 tis. Kč
  • 2 979 tis. Kč
  • GA ČR
Project

Transposition of MAF-type reliability indicators into the national reliability standards applicable in the corrective measures planning and evaluation in case of indication of generation inadequacy (TK01010037)

of the reliability standard for CZ power system, which is intended to replace the current N-1 reliability approaches that are no longer able to describe uncertainty continuously reliability characteristics of electric powe...

Energy and fuels

  • 2018 - 2020
  • 4 140 tis. Kč
  • 3 722 tis. Kč
  • TA ČR
Project

Methods and tools for evaluation and increase of reliability of human factor in the operational of nuclear instalation. (1H-PK/21)

Design and validation of the methodology for reliability evaluation of the human factor in the operation of nuclear power plants. Then, base on the methodology andincreasing of the human factor reliability, i.e. decreasing the possi...

AQ - Bezpečnost a ochrana zdraví, člověk – stroj

  • 2004 - 2008
  • 50 291 tis. Kč
  • 30 054 tis. Kč
  • MPO
Project

Reliability Analysis of Diagnostic and Classification procedures in Psychology. (GA406/09/0424)

for the purposes of reliability measuring of the diagnostic and classification procedures reliability are to by completed by inductive methods (the intervals of reliability, the hypothesis testing with required degree of <...

AN - Psychologie

  • 2009 - 2011
  • 1 102 tis. Kč
  • 1 102 tis. Kč
  • GA ČR
Project

Reliability of timber members and joints (OC E24.001)

The research project is oriented on problems of reliability of timber structures. The main objective is to extend established statistical methods and mechanics models to take into account the specific propertiesof wood and joints, making it ...

JN - Stavebnictví

  • 2001 - 2004
  • 2 950 tis. Kč
  • 1 350 tis. Kč
  • MŠMT
Project

Reliability of timber members and joints (1P05OC075)

designing of timber construction with assistance of partial coefficients of reliability, elaboration of probability method of designing on national level......

JN - Stavebnictví

  • 2005 - 2005
  • 91 tis. Kč
  • 91 tis. Kč
  • MŠMT
Project

Research of the reliability of electric distribution plants (GA102/96/1433)

The reliability of electric distribution plants as the principal precondition of distributivemachinery, whose reliability qualify the function capability of the whole system, participate on the reliability of power system. ...

JA - Elektronika a optoelektronika, elektrotechnika

  • 1996 - 1998
  • 738 tis. Kč
  • 738 tis. Kč
  • GA ČR
  • 1 - 10 out of 1 771