Filters
Analyse of variants of method room and pillar applicabled for exploitation of the coal deposits, fixed by protective pillar of the spa Darkov and of the town .. (GA105/97/0403)
The research will be made for mine Darkov, OKD a.s. company. The attention will be paid to geomechanical properties of coal and attendant rocks of the fill material and to the technology of exploitation followed with a very limited surface subsidence...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 1997 - 1998 •
- 789 tis. Kč •
- 499 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1997 - 1. 1. 1998
Uznané náklady
Podpora ze státního rozpočtu (63%)
Poskytovatel: Grantová agentura České republiky
Social pillar and sustainable development - Recommendations for the Ministry of Labour and Social Affairs of the Czech Republic based on international comparison (HR139/05)
The aim of the project is identify recommendations and conclusions based on international comparison of the social pillar of sustainable development. On these findings we will formulate coherent and holistic social pillar?s framewor...
AH - Ekonomie
- 2005 - 2005 •
- 398 tis. Kč •
- 398 tis. Kč •
- MPSV
Řešení projektu: 1. 1. 2005 - 1. 1. 2005
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo práce a sociálních věcí
International survey of tax benefits of the second and third pillar (HR148/06)
The purpose of the project is determination of the respective pillars of pension insurance, preparation of an overview of legislative acts in the tax area pillar. Moreover, the purpose is to prepare an overview of positives and nega...
AH - Ekonomie
- 2006 - 2006 •
- 593 tis. Kč •
- 593 tis. Kč •
- MPSV
Řešení projektu: 1. 1. 2006 - 1. 1. 2006
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo práce a sociálních věcí
Regional Contact Point Liberec - Contact for the European Research Area (LE11007)
by implementation oftwo action pillars ? Consulting activities (pillar I) and Specific support activities (pillar II)....
AE - Řízení, správa a administrativa
- 2011 - 2014 •
- 7 673 tis. Kč •
- 7 673 tis. Kč •
- MŠMT
Řešení projektu: 1. 3. 2011 - 31. 12. 2014
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo školství, mládeže a tělovýchovy
Research on innovative methods of mining stocks bound in coal mines (TB030CBU001)
calculation of existing pillars, draft of reinforcement of mining cannons and draft...
JG - Hutnictví, kovové materiály
- 2015 - 2016 •
- 5 500 tis. Kč •
- 5 500 tis. Kč •
- TA ČR
Řešení projektu: 1. 8. 2015 - 31. 12. 2016
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Technologická agentura ČR
Bench and pillar drilling machines HELTOS (TC5-163)
The projects goal is to develop the brand nero bench and pollar drilling machines with the continuous change of resolutions using the glar box. 0 0 0......
JR - Ostatní strojírenství
- 1999 - 2001 •
- 8 200 tis. Kč •
- 4 050 tis. Kč •
- MH
Řešení projektu: 1. 1. 1999 - 1. 1. 2001
Uznané náklady
Podpora ze státního rozpočtu (49%)
Poskytovatel: Ministerstvo hospodářství
Realization of underground openings in the zones influenced by aditional stresses in the vinicity of protective pillars of mine shafts and crosscuts in the rockburst prone mines. (AACBU22-03)
Mining activities in the zones influenced by additional stresses induced by protective pillars of mine shafts and crosscuts are usually endangered by higher rockbursts risk in the rockburts prone mines. The target of the solution is focused ...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 2003 - 2005 •
- 3 600 tis. Kč •
- 3 600 tis. Kč •
- ČBÚ
Řešení projektu: 1. 1. 2003 - 1. 1. 2005
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Český báňský úřad
The Economical and social pillar of sustainablae tourism in the Czech Republic (WA-307-06-303)
To accomplish a complex analysis of basic elements of the economical and social pillar of sustainable development of tourism in the C.R. To identify a file of indicators from an elaborate analysis considiring the principles of sustainable de...
AE - Řízení, správa a administrativa
- 2006 - 2006 •
- 980 tis. Kč •
- 980 tis. Kč •
- MMR
Řešení projektu: 1. 1. 2006 - 1. 1. 2006
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo pro místní rozvoj
*New line of universal tool - room milling machines INTOS. (1H-PK/04)
*New line of universal tool - room milling machines INTOS remarkably increase utility value and regarding to technical parametres shift new line over our competitors parametres.......
JQ - Strojní zařízení a nástroje
- 2004 - 2008 •
- 19 111 tis. Kč •
- 4 148 tis. Kč •
- MPO
Řešení projektu: 1. 1. 2004 - 31. 10. 2008
Uznané náklady
Podpora ze státního rozpočtu (22%)
Poskytovatel: Ministerstvo průmyslu a obchodu
Development of a multifunctional decontamination cabin system for ultra-clean rooms (EG17_175/0015484)
The aim of the project is the development of a new multifunctional system of decontamination booths for ultra-clean rooms connecting particle and microbiological decontamination. The project will propose a new concept of decontamination boot...
Epidemiology
- 2018 - 2022 •
- 12 048 tis. Kč •
- 0 tis. Kč •
- MPO
Řešení projektu: 14. 12. 2018 - 31. 12. 2022
Uznané náklady
Podpora ze státního rozpočtu (0%)
Poskytovatel: Ministerstvo průmyslu a obchodu
- 1 - 10 out of 305