All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

2 318 (0,066s)

Project

Forest Management Planning for Structurally Rich Forests - Pilot Project Continuation in the Conditions of the Sumava National Park (SE/640/4/03)

of the developed methodology for forest management based on statistical forest inventoryThis project is planned as a follow-up of the project VaV/620/4/00 "Forest Management Planning of Structurally Rich ...

GK - Lesnictví

  • 2003 - 2004
  • 2 100 tis. Kč
  • 2 000 tis. Kč
  • MŽP
Project

Optimization of Forest Inventory methods focused on indicators of forest dynamics required for repeated inventory cycles. (QF4132)

processing prior launching the next Czech Forest Inventory (FI) cycle. Data on dynamics of forest stands and ecosystems, primarily current increment of growing stock, will be obtained from the repeated inventory o...

GK - Lesnictví

  • 2004 - 2006
  • 5 593 tis. Kč
  • 5 593 tis. Kč
  • MZe
Project

Forest ecosystems inventory in the National park of Bohemian forest. (SE/620/2/99)

The aim of forest inventory in National park ćumava is to obtain a system of information on forest stands and forest ecosystems that would be comprehensive and easy to interpret. We apply an advanced field technolo...

DO - Ochrana krajinných území

  • 1999 - 2000
  • 980 tis. Kč
  • 980 tis. Kč
  • MŽP
Project

FORest management strategies to enhance the MITigation potential of European forests (7E13039)

To collect existing forest and soil data (e.g. satellite, maps, forest inventory, ICP, available statistics, soil maps) and consider management practices in order to develop a framework for assessing the mitigation...

GK - Lesnictví

  • 2013 - 2016
  • 1 081 tis. Kč
  • 1 081 tis. Kč
  • MŠMT
Project

Inventory of ecosystem carbon stock - adjustment of methodology according to the recommendation of IPCC on the basis of existing forest inventories and scenario analysis of carbon stock change (SM/640/14/03)

The aim of the project is an adjustment of methodology for carbon stock inventory in relation to the newly developed methodology of forest inventory and forest management planning applicable to structurally rich

GK - Lesnictví

  • 2003 - 2006
  • 1 720 tis. Kč
  • 1 600 tis. Kč
  • MŽP
Project

Development of new methods of forest inventory and management planning for the national parks in the Czech Republic. (SE/620/4/00)

The aim of the project is to develop new methods of forest inventory and management planning which will support the development of nature close methods of forest management which is preferable in national parks and nature p...

GK - Lesnictví

  • 2000 - 2002
  • 3 700 tis. Kč
  • 3 700 tis. Kč
  • MŽP
Project

Incorporation of internationally harmonized techniques of forest inventory into the methodology of the Czech NFI (1P05OC080)

formation of forest information system based on national forest inventarisation in Europe...

GK - Lesnictví

  • 2005 - 2008
  • 1 121 tis. Kč
  • 1 066 tis. Kč
  • MŠMT
Project

Effects of changing growth conditions on tree increment, stand production and vitality – danger or opportunity for the Central-European forestry? (GA14-12262S)

and vitality of trees grown in the conditions of Czech forests and open landscape. The project builds on woody biomass and forest soil data collected in the pilot statistical landscape inventory in the country (20...

GK - Lesnictví

  • 2014 - 2016
  • 13 422 tis. Kč
  • 13 422 tis. Kč
  • GA ČR
Project

Forest Ecosystems Inventory the National Park Šumava (SE/620/1/01)

The aim of forest inventory in National Park Sumava is to obtain a system of information on forest stands and forest ecosystems that would be comprehensive and easy to interpret. We aplly an advanced field technolo...

GK - Lesnictví

  • 2001 - 2003
  • 3 000 tis. Kč
  • 3 000 tis. Kč
  • MŽP
Project

Formulation of a standard methodology for assessing game damage to forest stands for use by local forest and game management authorities. (QF3017)

This project will test application of the methods of statistical inventory the network of temporary monitoring plots, which is located in forest stands occupying areas corresponding to the extent of the units under the loca...

GK - Lesnictví

  • 2003 - 2004
  • 988 tis. Kč
  • 988 tis. Kč
  • MZe
  • 1 - 10 out of 2 318