All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

1 099 (0,114s)

Project

Stone conservation for the refurbishment of buildings (7E08083)

STONECORE is a project dealing with the development and application of nano materials for consolidation annd conservation of natural and artificial stone. Six SMEs, four universities, one public research organisation and one public ...

JN - Stavebnictví

  • 2009 - 2011
  • 1 877 tis. Kč
  • 1 877 tis. Kč
  • MŠMT
Project

Stone Conservation for Refurbishment of Buildings (7E08080)

STONECORE is a project dealing with the development and application of nano materials for consolidation and conservation of natural and artificial stone. Six SMEs, four universities, one public research organisation and one public b...

AL - Umění, architektura, kulturní dědictví

  • 2008 - 2011
  • 1 707 tis. Kč
  • 1 707 tis. Kč
  • MŠMT
Project

Building stone surface topography and its application in the field of stone features restoration (DG20P02OVV021)

, documentation, and assessment of value of historical stone processing traces at historical of stone features at the researched area. The map will focus on details of processing and identification of the instruments used at chosen ...

Architectural design

  • 2020 - 2022
  • 12 874 tis. Kč
  • 12 874 tis. Kč
  • MK
Project

Bohemian Plaque Colums (PK95G01OPP054)

The project is specialised on the collection of historical, art historical and technological data about bohemian plaque columns with aim to publish results of this investigation. The data acquired are used as basis for the care of this sort of histor...

AL - Umění, architektura, kulturní dědictví

  • 1996 - 2010
  • 10 854 tis. Kč
  • 10 854 tis. Kč
  • MK
Project

A comprehensive methodology for the selection and processing of a stone intended for replacements and repairs of the ashlar masonry of historic buildings (DF12P01OVV020)

The main objective of the project is a comprehensive methodology for specialized surveys and repairs of the ashlar masonry of historic buildings consisting of sedimentary rocks. Summarizing the technical, technological and conservation requi...

AL - Umění, architektura, kulturní dědictví

  • 2012 - 2015
  • 15 758 tis. Kč
  • 15 634 tis. Kč
  • MK
Project

Conservation of Glass and Stone Mosaics of the Czech Mosaics School (DG16P02M056)

increase the quality of restoration interventions. Certified conservation concepts can be defined as follows: Elaboration of the map of exterior stone and ceramic for conservation treatments Elaboration of procedure concep...

AL - Umění, architektura, kulturní dědictví

  • 2016 - 2020
  • 16 874 tis. Kč
  • 16 842 tis. Kč
  • MK
Project

Natural stone in sculpture and architecture Czech Crown Lands - comprehensive knowledge of system resources, properties, use, durability, history of use, compatibility and interchangeability (DF13P01OVV008)

replacement of natural stone exploited and used for sculptural and architectural purposes natural resources (natural stone in this case) on heritage sites makes inevitable part through the establishment of complex knowledge system ...

AL - Umění, architektura, kulturní dědictví

  • 2013 - 2017
  • 16 066 tis. Kč
  • 15 867 tis. Kč
  • MK
Project

Long term monitoring of outdoor parameters and their negative influence on the condition of sculptures on the Charles Bridge in Prague. (PK99P04OPP005)

of sculptures,scientific research present condition of stone sculptures ...). The folloving decision about future conservation treatment of this valuable monument and should help......

AL - Umění, architektura, kulturní dědictví

  • 1999 - 2002
  • 2 626 tis. Kč
  • 2 626 tis. Kč
  • MK
Project

Optimisation of properties of mortar mixtures used for restoration of cultural monuments (GA103/06/1609)

Compensation of damaged and missing parts (by plastic repair) is a part of almost every conservation intervention on artistic and architectural monuments. From for conservation and restoration of architectural cultural heritage. The...

JN - Stavebnictví

  • 2006 - 2008
  • 1 778 tis. Kč
  • 1 778 tis. Kč
  • GA ČR
Project

Study of several conservation procedures for improvement of monument care systems (DF11P01OVV027)

heritage processes for building conservation, c) Elaboration of certified methods for long-term preventive conservation of sculptures in the baroque landscape concept of thematerial for stuccowork restoration prepared on the basis ...

AL - Umění, architektura, kulturní dědictví

  • 2011 - 2015
  • 18 696 tis. Kč
  • 17 960 tis. Kč
  • MK
  • 1 - 10 out of 1 099