Complex study of reclamation of slurry ponds and subsidence depressions in the context of landscape revitalisation after mining activity (GA105/01/0304)
Consequences of mining require large volumes of materials suitable for land reclamation of slurry ponds and subsidence depressions. This problem has many unknowns. Where can be obtained volumes of hundreds thousands cubic metres of ...
DD - Geochemie
- 2001 - 2003 •
- 3 367 tis. Kč •
- 1 950 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2001 - 1. 1. 2003
Uznané náklady
Podpora ze státního rozpočtu (58%)
Poskytovatel: Grantová agentura České republiky
New methods of prognosis of surface subsidence affected by underground exploitation of ore vein deposits of Rožná type (GP105/02/P026)
. However,prognosis of development of subsidence depressions above ore vein deposits development of subsidence depression both in phase of deposit mining and in of proposer of grant project a newly conceived mechan...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 2002 - 2004 •
- 1 051 tis. Kč •
- 523 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2002 - 1. 1. 2004
Uznané náklady
Podpora ze státního rozpočtu (50%)
Poskytovatel: Grantová agentura České republiky
The reclamation of flooded mine subsidence and sedimentation reservoirs in the Upper Silesian Mining Landscape (GA105/06/1242)
of saturated depressions and settling basins. Simultaneously, the goal of the project ecosystems of subsidence troughs and settling basins. The project deals with yet ofbasic research into recent sites of the mining landscape - sat...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 2006 - 2008 •
- 988 tis. Kč •
- 988 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2006 - 31. 12. 2008
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Character and development of movements and deformations of the surface above exploited sedimentary deposits under nontrivial geomechanical conditions (GA105/07/1586)
of Carboniferous layers and cover, etc.). It is apparent that the forming subsidence depression...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 2007 - 2009 •
- 2 016 tis. Kč •
- 2 016 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2007 - 31. 12. 2009
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
The assessment of mining subsidence boundaries and verification of expected surface subsidence (AACBU39-05)
The verification and analysis of current mining subsidence calculation methodology and prognosis of mining subsidence in Ostrava-Karvina Coal Basin.The proposal of upgrade of Notice No. 415/1991 Coll. in sense of assessment of mini...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 2005 - 2006 •
- 4 284 tis. Kč •
- 4 284 tis. Kč •
- ČBÚ
Řešení projektu: 1. 1. 2005 - 1. 1. 2006
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Český báňský úřad
Dynamics of mining subsidence basin and its incidence on mining region (GA105/00/1078)
The proposal of the project has logical contact with the resultes of solved project no. 105/97/0887 "Geodynamic effects in mining subsidence basin based points : - dynamics of process of formation of mining subsidence basin and its ...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 2000 - 2001 •
- 200 tis. Kč •
- 200 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2000 - 1. 1. 2001
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Physical geodetic processes in subsidence trough based on geodetic surveyins 'in situ' and their influence on territory affected by coal mining (GA105/97/0887)
Proposed project follows logically with results of solution of Grant project No: 105/931192 "Theory of Subsidence Trough, its Further Stages of Development and its of proposed project: Dynamic of subsidence through forming in areas ...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 1997 - 1998 •
- 280 tis. Kč •
- 280 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1997 - 1. 1. 1998
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Interferometric determination of subsidences caused by undermining by permanent scatters and phase unwrapping correction within (GA205/08/0452)
The project goal is to use interferometric stack processing in the region affected by undermining combined with open-cast mining which is partly covered by vegetation for subsidence detection. Urban objects are built on the waste dump and th...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 2008 - 2010 •
- 2 958 tis. Kč •
- 2 958 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2008 - 31. 12. 2010
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Analyse of variants of method room and pillar applicabled for exploitation of the coal deposits, fixed by protective pillar of the spa Darkov and of the town .. (GA105/97/0403)
The research will be made for mine Darkov, OKD a.s. company. The attention will be paid to geomechanical properties of coal and attendant rocks of the fill material and to the technology of exploitation followed with a very limited surface subsid...
DH - Báňský průmysl včetně těžby a zpracování uhlí
- 1997 - 1998 •
- 789 tis. Kč •
- 499 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1997 - 1. 1. 1998
Uznané náklady
Podpora ze státního rozpočtu (63%)
Poskytovatel: Grantová agentura České republiky
The Theory of Subsidence Area, Their Further Development and the Environmental Effects in the Mining Region (GA105/93/1192)
DB - Geologie a mineralogie
- 1993 - 1995 •
- 200 tis. Kč •
- 400 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1993 - 1. 1. 1995
Uznané náklady
Podpora ze státního rozpočtu (200%)
Poskytovatel: Grantová agentura České republiky
- 1 - 10 out of 190