Filters
Water towers – identification, documentation, presentation, new utilization (DG18P02OVV010)
Identification and registration of water tower reservoirs. Documentation of water tower reservoirs and their values. Converting tower reservoirs. Presentation and popularization of the results of education in the water <...
History (history of science and technology to be 6.3, history of specific sciences to be under the respective headings)
- 2018 - 2022 •
- 20 172 tis. Kč •
- 20 172 tis. Kč •
- MK
Řešení projektu: 1. 3. 2018 - 31. 12. 2022
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo kultury
Decreasing of the energy intensity of the forced draught cooling tower (TA02010417)
The aim of this project is decreasing of the energy intensity of the forces draught cooling tower by means of the aerodynamic optimization of the particular parts of the cooling tower. The cooling efficiency will be remain the same ...
JE - Nejaderná energetika, spotřeba a užití energie
- 2012 - 2014 •
- 11 401 tis. Kč •
- 7 103 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2012 - 31. 12. 2014
Uznané náklady
Podpora ze státního rozpočtu (62%)
Poskytovatel: Technologická agentura ČR
Acustic optimization of induced draft cooling towers (TH02020940)
The main objective of this project is to develop a set of cooling tower fans, which thermodynamic and acoustic parameters will correspond to the parameters achieved by the currently leading manufacturers of these devices. The project a softw...
BI - Akustika a kmity
- 2017 - 2020 •
- 31 889 tis. Kč •
- 19 029 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2017 - 30. 4. 2020
Uznané náklady
Podpora ze státního rozpočtu (60%)
Poskytovatel: Technologická agentura ČR
South Tower of St. Vitus´ Catedral in Prague Construction, Function, Meaning (GA408/03/0344)
The South Tower of St Vitus Cathedral in Prague: Construction, Function (The Study of theCathedral of St Vitus - the High Tower and the Facade of the South of the previous grant was a detailed documentation and study of the towe...
AL - Umění, architektura, kulturní dědictví
- 2003 - 2004 •
- 1 729 tis. Kč •
- 1 003 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2003 - 1. 1. 2004
Uznané náklady
Podpora ze státního rozpočtu (58%)
Poskytovatel: Grantová agentura České republiky
The use of optimization processes for the efficient design of structures of cooling tower (TA04011743)
The aim of the project is to create a methodology for efficient design of cooling towers to ensure the largest possible reduction in the cost of their construction, while ensuring their long-term operability. The results of the project a red...
JM - Inženýrské stavitelství
- 2014 - 2017 •
- 8 890 tis. Kč •
- 5 740 tis. Kč •
- TA ČR
Řešení projektu: 1. 7. 2014 - 31. 12. 2017
Uznané náklady
Podpora ze státního rozpočtu (65%)
Poskytovatel: Technologická agentura ČR
Novel method for in-field drift rate measurements (TK03020057)
The goal of the project is to develop measurement methodology of the size of the liquid phase drift from the space of the cooling towers and enable to determine the drift on the surface of the tower in one moment via the net of the ...
Energy and fuels
- 2020 - 2022 •
- 10 286 tis. Kč •
- 5 993 tis. Kč •
- TA ČR
Řešení projektu: 1. 7. 2020 - 31. 12. 2022
Uznané náklady
Podpora ze státního rozpočtu (58%)
Poskytovatel: Technologická agentura ČR
Project of the Research in to the Architecture and Sculptural Decoration of the Tall South Tower of St. Vitu´s Cathedral in Prahue, and the South Facade of the (GA408/98/1245)
The research into the outer surface of the St.Vitus´Cathedral and the south tower in particular, lags behind the present - day demands. The objective and abundant sculptural decoration of the south tower - its original medieval tors...
AL - Umění, architektura, kulturní dědictví
- 1998 - 2000 •
- 2 684 tis. Kč •
- 2 455 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1998 - 1. 1. 2000
Uznané náklady
Podpora ze státního rozpočtu (91%)
Poskytovatel: Grantová agentura České republiky
Cooling Towers Plume Abatement (TA01020709)
The aim of this project is to extend the range of products supplied by the applicant organization by the components of the system (and all systems) designed to eliminate the so-called "steam plume. The project solves these issues through both convent...
BJ - Termodynamika
- 2011 - 2014 •
- 24 969 tis. Kč •
- 19 707 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2011 - 31. 12. 2014
Uznané náklady
Podpora ze státního rozpočtu (79%)
Poskytovatel: Technologická agentura ČR
Energetical and environmental optimisation of cooling towers (2A-1TP1/132)
The project proposal deals with the optimization of the design, construction and operating of cooling towers from the point of view of the minization of both operational costs and negative environmental impact. The main goal is to gain data ...
JE - Nejaderná energetika, spotřeba a užití energie
- 2006 - 2009 •
- 16 404 tis. Kč •
- 7 125 tis. Kč •
- MPO
Řešení projektu: 1. 11. 2006 - 31. 10. 2009
Uznané náklady
Podpora ze státního rozpočtu (43%)
Poskytovatel: Ministerstvo průmyslu a obchodu
*Synchronous motors with improved performance intended as direct fan drive for cooling towers (FI-IM5/026)
*Development, verification and implementation of production of the new range of synchronous motors with rare-earth permanent magnets on rotor. This new range of synchronous motors with improved performance in the power output range of 8kW to 110kW is...
JA - Elektronika a optoelektronika, elektrotechnika
- 2008 - 2010 •
- 52 800 tis. Kč •
- 13 200 tis. Kč •
- MPO
Řešení projektu: 1. 4. 2008 - 31. 10. 2010
Uznané náklady
Podpora ze státního rozpočtu (25%)
Poskytovatel: Ministerstvo průmyslu a obchodu
- 1 - 10 out of 48