All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

2 376 (0,113s)

Project

Experimental verification of the tunnel lining performance (GA103/05/2231)

Title: Experimental verificadon of the tunnel lining performance A number of tunnels under construction and in the planning stage are increasing are unreliable and exhibit large statistical scatter. The design of tunnel...

JM - Inženýrské stavitelství

  • 2005 - 2007
  • 3 840 tis. Kč
  • 3 840 tis. Kč
  • GA ČR
Project

Utilization of New Technologies and Procedures in Tunnel Lining Maintenance and in the Recycling of Aggregates for the Application of Safety Finishes (EG19_262/0020178)

The current technology for the protection of tunnel linings is not suitable, and therefore the applicant comes up with a solution through the submitted project.......

Architecture engineering

  • 2020 - 2022
  • 10 944 tis. Kč
  • 0 tis. Kč
  • MPO
Project

Tunnel lining reinforced with composite materials with increased durability and resistance (CK04000283)

intended for tunnel lining fully reinforced with GFRP reinf. This segment for their interruption. Important aspect will be also the development of the tunnel lining segment of fire. Methodology for testing tun...

Construction engineering, Municipal and structural engineering

  • 2023 - 2026
  • 18 213 tis. Kč
  • 12 045 tis. Kč
  • TA ČR
Project

Increase the reliability and lifetime of the tunnel lining using information models and new approaches (CK02000175)

of a methodology for procedures for monitoring the secondary lining of the tunnel throughout the life cycle of the tunnel needed to evaluate its behavior and assess the technical of a catalog of defects and failures of the...

Civil engineering

  • 2021 - 2023
  • 6 962 tis. Kč
  • 5 569 tis. Kč
  • TA ČR
Project

The development and evaluation of fibre reinforced concrete to fulfil actual requirements on precast lining of transport tunnels (GAP104/10/2023)

of fibre reinforced concrete for segmental tunnel lining is a growing trend due to its will satisfyCzech and European requirements for segmental lining of transport tunnels. TestingTunnelling is a rapidly...

JN - Stavebnictví

  • 2010 - 2012
  • 4 404 tis. Kč
  • 4 404 tis. Kč
  • GA ČR
Project

Long-term observation of tunnel linings (GA103/08/1691)

for tunnel lining design from measurements executed during the construction and during the service life of the tunnel. The two kinds of measurements are proposed. The first one covers measurement during driving the tun...

JM - Inženýrské stavitelství

  • 2008 - 2010
  • 3 989 tis. Kč
  • 3 989 tis. Kč
  • GA ČR
Project

Progressive methods of designing and development of new technologies in underground structures (GA103/97/0022)

all the contact pressure on the back on the tunnel lining and the radial mutual interaction of the rock massif with the tunnel lining. The stress is laid to improve the quality of the current method of proportioni...

JM - Inženýrské stavitelství

  • 1997 - 1999
  • 2 603 tis. Kč
  • 2 603 tis. Kč
  • GA ČR
Project

Inspection camera tunnel for in-line continuous detection of product defects (EI22_002/0000672)

The goal is to develop a camera tunnel for in-line continuous defect detection of products that use inspection of >80% of the visible surface without stopping the conveyor and recognize defects with high reliability. It also include...

Electrical and electronic engineering

  • 2023 - 2025
  • 12 682 tis. Kč
  • 0 tis. Kč
  • MPO
Project

Implementation of a new technology of monolithic tunnel lining driven by TBM in civil engineering (CK03000045)

The main project objective is development and research of a new energy-saving industrial technology of monolithic lining of TBM tunnels, securing time, space, as well as the possibility to modify the TBM (Tunnel boring mach...

Civil engineering

  • 2022 - 2025
  • 24 244 tis. Kč
  • 16 767 tis. Kč
  • TA ČR
Project

Reducing material and energy costs of conventionally excavated tunnels using the interaction of primary and secondary linings to increase the efficiency of load-bearing elements of the structure (TA03031186)

construction. New technological procedure will reduce the thickness of secondary lining the tunnel lining, leading inter alia to reduce the economic cost of the underground of the lining and the use of its interac...

JM - Inženýrské stavitelství

  • 2013 - 2015
  • 10 000 tis. Kč
  • 6 500 tis. Kč
  • TA ČR
  • 1 - 10 out of 2 376