All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

The unfinished Hitler's motorway – a heritage in the contemporary landscape

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00027073%3A_____%2F23%3AN0000043" target="_blank" >RIV/00027073:_____/23:N0000043 - isvavai.cz</a>

  • Alternative codes found

    RIV/44994575:_____/23:10001734

  • Result on the web

    <a href="http://doi.mendelu.cz/artkey/doi-990003-9300_the-unfinished-hitler-8217-s-motorway-8211-a-heritage-in-the-contemporary-landscape.php" target="_blank" >http://doi.mendelu.cz/artkey/doi-990003-9300_the-unfinished-hitler-8217-s-motorway-8211-a-heritage-in-the-contemporary-landscape.php</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.11118/978-80-7509-904-4-0340" target="_blank" >10.11118/978-80-7509-904-4-0340</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    The unfinished Hitler's motorway – a heritage in the contemporary landscape

  • Original language description

    The unfinished extraterritorial motorway A88 Breslau – Wien, also known as Hitler's motorway, was a strategic construction of the German Reich connecting major centres through the territory of Czechoslovakia (later Protectorate of Bohemia and Moravia). Within the present-day territory of the Czech Republic, work on the Hitler Motorway began in April 1939 and was halted in April 1942, with a total of 85 km of the motorway being built out of a total of 320 km. In 80 years, only three short, isolated sections have been completed as highways or roads. Most of the completed part of the route is kept as a zoning reserve for the construction of a capacity road from Brno to Moravská Třebová. In addition to standard agricultural areas, there are relatively attractive green infrastructure elements in the landscape in several places. They are represented by shrubs, tree vegetation or meadows. Two sites are currently protected as nature reserves and natural monuments. From the point of view of recreation and tourism, some preserved technical infrastructure objects are also attractive, e.g. motorway bridges, culverts, earthworks on notches. The aim of this paper is to evaluate the heritage of the unfinished motorway in the current landscape, with an emphasis on its potential in green infrastructure of the landscape and its use in local and regional tourism and recreation.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    50703 - Transport planning and social aspects of transport (transport engineering to be 2.1)

Result continuities

  • Project

  • Continuities

    I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace

Others

  • Publication year

    2023

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Public Recreation and Landscape Protection - With Environment Hand in Hand? Proceedings of the 14th Conference

  • ISBN

    978-807509905-1

  • ISSN

    2336-6311

  • e-ISSN

    2336-632X

  • Number of pages

    6

  • Pages from-to

    340-345

  • Publisher name

    Mendel University in Brno

  • Place of publication

    Brno

  • Event location

    Křtiny

  • Event date

    May 9, 2023

  • Type of event by nationality

    EUR - Evropská akce

  • UT code for WoS article