All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Multiobjective optimization of hybrid wind-photovoltaic plants with battery energy storage system: Current situation and possible regulatory changes

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216208%3A11230%2F22%3A10447671" target="_blank" >RIV/00216208:11230/22:10447671 - isvavai.cz</a>

  • Result on the web

    <a href="https://verso.is.cuni.cz/pub/verso.fpl?fname=obd_publikace_handle&handle=aX5LkiBYDY" target="_blank" >https://verso.is.cuni.cz/pub/verso.fpl?fname=obd_publikace_handle&handle=aX5LkiBYDY</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1016/j.est.2022.104467" target="_blank" >10.1016/j.est.2022.104467</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Multiobjective optimization of hybrid wind-photovoltaic plants with battery energy storage system: Current situation and possible regulatory changes

  • Original language description

    The challenges presented by increased electricity generation from intermittent renewable energy sources can be minimized by incorporating energy storage systems (ESS). Despite the benefits, this is still an emerging technology with limited use in Brazil. The aim of the present study is to use a multiobjective optimization process to support the planning of hybrid wind-photovoltaic projects with utility-scale Li-ion battery ESS. Levelised cost of energy (LCOE), diversified energy production density, and net present value are considered as the objectives. The multiobjective optimization is conducted in view of the possible impact of regulatory adjustments necessary for the integration of ESS in the Brazilian context. The optimization problem has been formulated using the mixture arrangement technique and the Normal Boundary Intersection approach is adopted for search in the design space. It is shown that in the current scenario, the possibility of integrating storage reaches only 17.7% of the project capacity. In addition, the investment cost in ESS impacts the viability of the project more than the payout for the service provided. Thus, regulatory adjustments must (i) allow the generation of multiple revenues and avoid double taxation; (ii) predict whether there will be a defined minimum payment for services rendered and/ or whether there will be a subsidized credit line; and (iii) develop the production chain that involves storage or create tax incentives for importing equipment to reduce costs. Finally, it is important to highlight that the ESS imposes an increase in the load for the system as a whole and this characteristic needs to be considered for longterm planning.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database

  • CEP classification

  • OECD FORD branch

    50201 - Economic Theory

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2022

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Journal of Energy Storage [online]

  • ISSN

    2352-152X

  • e-ISSN

  • Volume of the periodical

    51

  • Issue of the periodical within the volume

    July 2022

  • Country of publishing house

    NL - THE KINGDOM OF THE NETHERLANDS

  • Number of pages

    25

  • Pages from-to

    104467

  • UT code for WoS article

    000790188200001

  • EID of the result in the Scopus database

    2-s2.0-85126892391