All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Reactive Recovery from Machine Breakdown in Production Scheduling with Temporal Distance and Resource Constraints

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216208%3A11320%2F15%3A10318882" target="_blank" >RIV/00216208:11320/15:10318882 - isvavai.cz</a>

  • Result on the web

    <a href="http://dx.doi.org/10.5220/0005215701190130" target="_blank" >http://dx.doi.org/10.5220/0005215701190130</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.5220/0005215701190130" target="_blank" >10.5220/0005215701190130</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Reactive Recovery from Machine Breakdown in Production Scheduling with Temporal Distance and Resource Constraints

  • Original language description

    One of the classical problems of real-life production scheduling is dynamics of manufacturing environ-ments with new production demands coming and breaking machines during the schedule execution. Simplerescheduling from scratch in response to unexpectedevents occurring on the shop ?oor may require exces-sive computation time. Moreover, the recovered schedule may be deviated prohibitively from the ongoingschedule. This paper studies two methods how to modify a schedule in response to a resource failure:right-shift of affected activities and simple temporal network recovery. The importance is put on the speed of therescheduling procedures as well as on the minimum deviation from the original schedule. The schedulingmodel is motivated by the FlowOpt project, which is based on Temporal Networks with Alternatives andsupports simple temporal constraints between the activities.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

    IN - Informatics

  • OECD FORD branch

Result continuities

  • Project

    Result was created during the realization of more than one project. More information in the Projects tab.

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2015

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    ICAART 2015 - Proceedings of the International Conference on Agents and Artificial Intelligence, Volume 2

  • ISBN

    978-989-758-074-1

  • ISSN

  • e-ISSN

  • Number of pages

    12

  • Pages from-to

    119-130

  • Publisher name

    Science and Technology Publications, Lda

  • Place of publication

    Setúbal, Portugal

  • Event location

    Lisbon, Portugal

  • Event date

    Jan 10, 2015

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article