All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

The restoration of the Stone Fountain in Kutná Hora: An assessment of the contemporary intervention within the context of repairs throughout history

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216275%3A25110%2F16%3A39901252" target="_blank" >RIV/00216275:25110/16:39901252 - isvavai.cz</a>

  • Result on the web

    <a href="http://dx.doi.org/10.1080/00393630.2016.1206246" target="_blank" >http://dx.doi.org/10.1080/00393630.2016.1206246</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1080/00393630.2016.1206246" target="_blank" >10.1080/00393630.2016.1206246</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    The restoration of the Stone Fountain in Kutná Hora: An assessment of the contemporary intervention within the context of repairs throughout history

  • Original language description

    The Stone Fountain is situated in the historical centre of Kutná Hora, a UNESCO listed town, and one of the most important monuments in Bohemia. The fountain was constructed from 1493 to 1495 and was originally built of biodetritic limestone. During extensive reconstruction in the nineteenth century a substantial part of the ornamentation was replaced with fine-grained sandstone of inferior quality, resulting in a range of problems at a later date. During the twentieth century, the fountain underwent several repairs which failed to halt the process of degradation, and conversely had a negative effect on the condition of the monument. The last restoration intervention, undertaken from 2010 to 2011, resulted after a thorough examination of the monument documenting the damage and establishing the principal causes of the damage. The subsequent conservation, proposed on the basis of the aforementioned examination, revolved around the extensive cement repairs and acrylic coatings covering the surface, causing significant deterioration to the stone underneath. Furthermore, the deep salinity of the masonry and vast diversity of materials had to be addressed, alongside questions concerning the presentation of the architectonic work and options for its preventive conservation. This article includes a description of the adopted concept, applied processes, and an assessment of the interventions after a five-year interval.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>x</sub> - Unclassified - Peer-reviewed scientific article (Jimp, Jsc and Jost)

  • CEP classification

    AL - Art, architecture, cultural heritage

  • OECD FORD branch

Result continuities

  • Project

  • Continuities

    I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace

Others

  • Publication year

    2016

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Studies in Conservation

  • ISSN

    0039-3630

  • e-ISSN

  • Volume of the periodical

    2016

  • Issue of the periodical within the volume

    srpen

  • Country of publishing house

    GB - UNITED KINGDOM

  • Number of pages

    13

  • Pages from-to

    1-13

  • UT code for WoS article

  • EID of the result in the Scopus database