New Control System for Crude Oil Processing Improving of Control Quality and Plant Operability
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216275%3A25310%2F00%3A00000180" target="_blank" >RIV/00216275:25310/00:00000180 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
New Control System for Crude Oil Processing Improving of Control Quality and Plant Operability
Original language description
The design of the new control system for crude oil processing in the PARAMO refinery a. s. Pardubice was divided into three different parts: (1) gain - scheduling metod and feedforward metod for the level control of the desalter tang (2) a special ratio
Czech name
—
Czech description
—
Classification
Type
J<sub>x</sub> - Unclassified - Peer-reviewed scientific article (Jimp, Jsc and Jost)
CEP classification
JB - Sensors, detecting elements, measurement and regulation
OECD FORD branch
—
Result continuities
Project
—
Continuities
Z - Vyzkumny zamer (s odkazem do CEZ)
Others
Publication year
2000
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Name of the periodical
Industry Engineering Chemistry Research
ISSN
0888-5885
e-ISSN
—
Volume of the periodical
39
Issue of the periodical within the volume
3
Country of publishing house
US - UNITED STATES
Number of pages
6
Pages from-to
—
UT code for WoS article
—
EID of the result in the Scopus database
—