Site Planning on the Basis of Priority Processing
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F05%3APU44426" target="_blank" >RIV/00216305:26110/05:PU44426 - isvavai.cz</a>
Alternative codes found
RIV/00216305:26110/06:PU44426
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Site Planning on the Basis of Priority Processing
Original language description
The paper deals with a new method intended for planning and scheduling of building works in the construction phase of an investment project. Priority activities of the proposed method are the tasks that require maximum attention paid by a construction manager for continuous progress so that their execution on the building site might be without idle time of machines.
Czech name
Priority činností při plánování postupu výstavby
Czech description
Organizace stavebních prací v realizační fázi výstavbového projektu. Navrhovaná metoda umožňuje manažeru stavby řešit prioritu činností a zabránit prostojům nákladných mechanizmů.
Classification
Type
J<sub>x</sub> - Unclassified - Peer-reviewed scientific article (Jimp, Jsc and Jost)
CEP classification
JN - Civil engineering
OECD FORD branch
—
Result continuities
Project
—
Continuities
Z - Vyzkumny zamer (s odkazem do CEZ)
Others
Publication year
2006
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Name of the periodical
Slovak Journal of Civil Emgineering
ISSN
1210-3896
e-ISSN
—
Volume of the periodical
2005
Issue of the periodical within the volume
1
Country of publishing house
SK - SLOVAKIA
Number of pages
7
Pages from-to
1-7
UT code for WoS article
—
EID of the result in the Scopus database
—