Practical application of dam breach due to overtopping
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F07%3APU71001" target="_blank" >RIV/00216305:26110/07:PU71001 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Practical application of dam breach due to overtopping
Original language description
The existence of the dams retaining water is always connected with the risk of their failure. The failure of a dam gives rise of a flood wave that advances through a valley below the dam. The effects of a dam break wave originated in this way may have disastrous consequences and may cause numerous fatalities and a financial loss exceeding many times the price of the water structure itself. The analysis of embankment dam failures shows that most failures were caused by overtopping and by piping. Overtopping occurs when the water level of the reservoir behind the dam rises above the dam crest. It can be caused by an insufficient spillway capacity, improper manipulation, a landslide in the reservoir or when the design discharge is exceeded. Practical application of evaluation of maximum breach discharge is carried out in a case study (the Korycany dam). The results of the Koryčany dam failure modeling included the maximum breach discharge, the time of the failure duration, the breach disc
Czech name
Practical application of dam breach due to overtopping
Czech description
The existence of the dams retaining water is always connected with the risk of their failure. The failure of a dam gives rise of a flood wave that advances through a valley below the dam. The effects of a dam break wave originated in this way may have disastrous consequences and may cause numerous fatalities and a financial loss exceeding many times the price of the water structure itself. The analysis of embankment dam failures shows that most failures were caused by overtopping and by piping. Overtopping occurs when the water level of the reservoir behind the dam rises above the dam crest. It can be caused by an insufficient spillway capacity, improper manipulation, a landslide in the reservoir or when the design discharge is exceeded. Practical application of evaluation of maximum breach discharge is carried out in a case study (the Korycany dam). The results of the Koryčany dam failure modeling included the maximum breach discharge, the time of the failure duration, the breach disc
Classification
Type
D - Article in proceedings
CEP classification
JN - Civil engineering
OECD FORD branch
—
Result continuities
Project
<a href="/en/project/GA103%2F05%2F2391" target="_blank" >GA103/05/2391: Research of methods of risk analysis as a tool for evaluation of dam safety</a><br>
Continuities
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Others
Publication year
2007
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
10th International Sympozium on Water Management and Hydraulic Engineering
ISBN
978-953-6272-22-8
ISSN
—
e-ISSN
—
Number of pages
11
Pages from-to
59-69
Publisher name
Faculty of Civil Engineering - Zagreb
Place of publication
Zagreb
Event location
Šibenik, Crotia
Event date
Sep 4, 2007
Type of event by nationality
EUR - Evropská akce
UT code for WoS article
—