Willamette river bridge, Eugene, Oregon, USA
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F11%3APU92732" target="_blank" >RIV/00216305:26110/11:PU92732 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Willamette river bridge, Eugene, Oregon, USA
Original language description
The interstate I-5 bridge of total length of 604.9 m is described in terms of its architectural and structural solution and a process of the construction. The bridge consists of the main bridge crossing the river and approaches crossing the local highway and railways. The main bridge is formed by two arch spans of length 118.877 and 126.786 m. The deck that is formed by two girders and a deck slab is stiffened by cross beams, the arches are formed by two ribs without any bracing. The bridge was designed on the basis of a very detailed static and dynamic analysis.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
JM - Structural engineering
OECD FORD branch
—
Result continuities
Project
<a href="/en/project/FI-IM5%2F128" target="_blank" >FI-IM5/128: Progressive structures from high-performance concrete</a><br>
Continuities
Z - Vyzkumny zamer (s odkazem do CEZ)
Others
Publication year
2011
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
fib Symposium PRAGUE 2011 CONCRETE ENGINEERING FOR EXCELLENCE AND EFFICIENCY
ISBN
978-80-87158-29-6
ISSN
—
e-ISSN
—
Number of pages
4
Pages from-to
963-966
Publisher name
Czech Concrete Society (CBS) / Czech fib National Member Group
Place of publication
Praha
Event location
Praha
Event date
Jun 8, 2011
Type of event by nationality
WRD - Celosvětová akce
UT code for WoS article
—