All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Traffic flow harmonisation and increasing the highway capacity during the road works using portable co-operative its systems - portable active traffic management

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F11%3APU94124" target="_blank" >RIV/00216305:26110/11:PU94124 - isvavai.cz</a>

  • Result on the web

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    čeština

  • Original language name

    Traffic flow harmonisation and increasing the highway capacity during the road works using portable co-operative its systems - portable active traffic management

  • Original language description

    Queuing and congestions occur to a great extent at the spots where road works take place. This fact presents continuous growth of external travel costs, lowered traffic comfort, increased travel times, significantly increased stress factor and not leasthigher risk of accidents. Extensive investment into repair of roads and bridges are expected, including planned reconstruction and widening of the D1 highway. All those interferences with traffic flow capacity will be reflected notably in traffic fluencyand safety. ViaZONE project brings suggestions how to reduce the impacts of necessary repairs and how to markedly improve capacity of the given road and increase traffic fluency, even in the long term, using present-day portable co-operative telematicssystems.

  • Czech name

    Traffic flow harmonisation and increasing the highway capacity during the road works using portable co-operative its systems - portable active traffic management

  • Czech description

    Queuing and congestions occur to a great extent at the spots where road works take place. This fact presents continuous growth of external travel costs, lowered traffic comfort, increased travel times, significantly increased stress factor and not leasthigher risk of accidents. Extensive investment into repair of roads and bridges are expected, including planned reconstruction and widening of the D1 highway. All those interferences with traffic flow capacity will be reflected notably in traffic fluencyand safety. ViaZONE project brings suggestions how to reduce the impacts of necessary repairs and how to markedly improve capacity of the given road and increase traffic fluency, even in the long term, using present-day portable co-operative telematicssystems.

Classification

  • Type

    D - Article in proceedings

  • CEP classification

    JM - Structural engineering

  • OECD FORD branch

Result continuities

  • Project

    Result was created during the realization of more than one project. More information in the Projects tab.

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2011

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    MOSATT 2011 - Modern Safety Technologies in Transportation

  • ISBN

    978-80-970772-0-4

  • ISSN

  • e-ISSN

  • Number of pages

    6

  • Pages from-to

    355-360

  • Publisher name

    Slovak Transport Society at the Slovak Academy of Sciences

  • Place of publication

    Bratislava

  • Event location

    Zlata Idka, Slovakia

  • Event date

    Sep 20, 2011

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article