All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Estimation of bridge construction dynamic parameters

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F12%3APU98889" target="_blank" >RIV/00216305:26110/12:PU98889 - isvavai.cz</a>

  • Result on the web

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    angličtina

  • Original language name

    Estimation of bridge construction dynamic parameters

  • Original language description

    The work describes the process of bridge construction dynamic parameters estimation using optical measurement obtained with automated system developed at FCE BUT in Brno. An experiment was realized within tests with objective to determine significant natural frequencies and amplitudes at dynamic load from two independent measurements and to analyze achieved accuracy. As observed object was used 78-meters long walkway for pedestrians at Svratecká Street in Brno. There is a brief introduction of object and hardware and software components of the system in this paper, followed by description of experiment and data processing. Finally estimated dynamic parameters values and comparison of independent results are presented.

  • Czech name

  • Czech description

Classification

  • Type

    O - Miscellaneous

  • CEP classification

    JN - Civil engineering

  • OECD FORD branch

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2012

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů