All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

The testing methodology of new developed steel temporary truss footbridge details in case of cyclic loading

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F13%3APU107197" target="_blank" >RIV/00216305:26110/13:PU107197 - isvavai.cz</a>

  • Result on the web

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    angličtina

  • Original language name

    The testing methodology of new developed steel temporary truss footbridge details in case of cyclic loading

  • Original language description

    Recently, within the framework of research projects made by our Institute of Metal and Timber Structures in co-operation with company Vladimír Fišer and Technology Agency of the Czech Republic, they were designed and realized several loading tests of some selected details of new steel temporary through truss footbridge, which has 15.0 m span and consists of five 3.0 m length assembly units. The entire idea of these research projects is to develop new type of simply temporary footbridge, which can effectively create or replace a self-supporting way for pedestrians and cyclists in case of some events like reconstructions, building site, floods, etc. It should also be used as a permanent bridge, if needed. This paper brings some information about made experiments and their results, especially in case of cyclic loading.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

    JM - Structural engineering

  • OECD FORD branch

Result continuities

  • Project

    Result was created during the realization of more than one project. More information in the Projects tab.

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2013

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Recent Advances in Civil and Mining Engineering - Proceedings of the 4th European Conference of Civil Engineerinng (ECCIE '13)

  • ISBN

    978-960-474-337-7

  • ISSN

    2227-4588

  • e-ISSN

  • Number of pages

    345

  • Pages from-to

    207-210

  • Publisher name

    WSEAS Press

  • Place of publication

    Antalya, Turkey

  • Event location

    Antalya

  • Event date

    Oct 8, 2013

  • Type of event by nationality

    EUR - Evropská akce

  • UT code for WoS article