Geodetic Monitoring for the Diagnostics of a Historical Railway Bridge
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F14%3APU110787" target="_blank" >RIV/00216305:26110/14:PU110787 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Geodetic Monitoring for the Diagnostics of a Historical Railway Bridge
Original language description
This article deals with the long-term (seasonal) and short-term monitoring of Křenová historical railway bridge construction in Brno. Leica DNA03 digital leveling system was used for seasonal epoch monitoring. Automatic leveling system was used for the short-term load test monitoring. The automatic leveling system consists of two Leica DNA03 digital levels and one Leica NA3003 digital level. All digital levels are controlled by special software application. Continuous leveling is used to monitor deformations at top of the bridge vault during the load test. The results of the continuous measurement are combined with the result of the epoch measurement.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
JN - Civil engineering
OECD FORD branch
—
Result continuities
Project
—
Continuities
S - Specificky vyzkum na vysokych skolach
Others
Publication year
2014
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
GEODÉZIA, KARTOGRAFIA A GEOGRAFICKÉ INFORMAČNÉ SYSTÉMY 2014
ISBN
978-80-553-1781-6
ISSN
—
e-ISSN
—
Number of pages
9
Pages from-to
1-9
Publisher name
Technická univerzita v Košiciach, Fakulta BERG
Place of publication
Košice, Slovensko
Event location
Tatranské Matliare
Event date
Sep 17, 2014
Type of event by nationality
CST - Celostátní akce
UT code for WoS article
—