OPTIMIZATION OF OVERHEAD COSTS THE CONSTRUCTION WORKS FROM THE PERSPECTIVE OF CONTRACTOR
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F16%3APU121294" target="_blank" >RIV/00216305:26110/16:PU121294 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
OPTIMIZATION OF OVERHEAD COSTS THE CONSTRUCTION WORKS FROM THE PERSPECTIVE OF CONTRACTOR
Original language description
The issue of overhead costs is within each construction company solved individually. General overhead costs are based on the previous financial year. From these data is created a plan for next year, which is reflected in the calculation of each construction contract. However is essential to take into account for the vast majority of production, what type of construction work goes, it is because for different types of work are laid down various production overheads. In the Czech Republic is not a lot of literature, which deals with production overheads in construction. In the frame of used methodology it is necessary to divide the construction according to the nature of the works that description as accurate as possible.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
—
OECD FORD branch
20101 - Civil engineering
Result continuities
Project
—
Continuities
I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Others
Publication year
2016
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
PBE PhD FORUM 2016
ISBN
978-80-214-5407-1
ISSN
—
e-ISSN
—
Number of pages
8
Pages from-to
63-70
Publisher name
VUT v Brně, FAST
Place of publication
Brno
Event location
Luhačovice
Event date
Sep 29, 2016
Type of event by nationality
CST - Celostátní akce
UT code for WoS article
—