ACCURACY OF A PARAMETRICALLY DETERMINED PRICE OFFER FOR LOW ENERGY AND PASSIVE FAMILY HOUSES
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F19%3APU133277" target="_blank" >RIV/00216305:26110/19:PU133277 - isvavai.cz</a>
Result on the web
<a href="https://www.proquest.com/docview/2326852714?accountid=17115" target="_blank" >https://www.proquest.com/docview/2326852714?accountid=17115</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.5593/sgem2019/6.2/S27.043" target="_blank" >10.5593/sgem2019/6.2/S27.043</a>
Alternative languages
Result language
angličtina
Original language name
ACCURACY OF A PARAMETRICALLY DETERMINED PRICE OFFER FOR LOW ENERGY AND PASSIVE FAMILY HOUSES
Original language description
The authors presents part of his case study for the implementation of “parametric budgeting” innovation in this article, presenting it in respective construction company, focused on construction of passive and low-energy family houses on the basis of wood – green buildings. In general, the study focuses on meeting of innovation objectives in the area of construction objects’ pricing with focus on preparation of price offers for the construction of low-energy and passive building, designed for living, in the Czech Republic. From the investor’s point of view, the price offer set by construction company is the acquisition price = the price for low-energy and passive buildings. The objectives of innovation are saving the time, reduction of costs and the reduction of total requirements for human resources’ qualification during the preparation of price offers for construction work. Parametric budgeting is the right method for implementation into the environment of programs allowing the Building Information Modelling/Management. In case of successful innovation, construction companies may get the possibility of better cost assessment for different options of technical solution related to the construction of passive and low-energy buildings for living in the Czech Republic. In the article, there are results presented as well as parts of case study -section of achievement of the objective to reduce costs within the limits of permitted deviation. The prices offers, determined by itemized budgets (traditional methodology of price offer preparation in construction companies in the Czech Republic), and the price offers determined by parametric budgeting tool for the same construction objects are applied as compared price offers. Each evaluated construction object is a family house on the basis of wood within a low-energy or passive standard under qualification applied in the Czech Republic. In the research, calculation methodologies of constructions costs’ determination were us
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
—
OECD FORD branch
20101 - Civil engineering
Result continuities
Project
—
Continuities
I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Others
Publication year
2019
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
19th INTERNATIONAL MULTIDISCIPLINARY SCIENTIFIC GEOCONFERENCE SGEM 2019
ISBN
978-6-1974-0889-8
ISSN
1314-2704
e-ISSN
—
Number of pages
8
Pages from-to
1-8
Publisher name
International Multidisciplinary Scientific Geoconference
Place of publication
Albena, Bulharsko
Event location
Albena
Event date
Jun 28, 2019
Type of event by nationality
WRD - Celosvětová akce
UT code for WoS article
—