All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Selecting and Evaluating Suppliers in the Czech Construction Sector

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F20%3APU137023" target="_blank" >RIV/00216305:26110/20:PU137023 - isvavai.cz</a>

  • Result on the web

    <a href="https://pp.bme.hu/so/article/view/13328" target="_blank" >https://pp.bme.hu/so/article/view/13328</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.3311/PPso.13328" target="_blank" >10.3311/PPso.13328</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Selecting and Evaluating Suppliers in the Czech Construction Sector

  • Original language description

    Selecting a capable contractor is one of the crucial prerequisites for the successful completion of a construction project. This paper addresses the issue of selecting and measuring the performance of suppliers. Using a web-based questionnaire survey, quantitative data was collected from Czech construction companies that act as main contractors and subcontractors within the supply chain. The data was evaluated by applying absolute and relative frequency, the relative importance index and the chi-square test of independence. The findings revealed several managerial implications for purchasing professionals in both areas. The findings were of interest with regard to the significance of individual selection criteria in the selection of suppliers. Data was analysed on both the usage of performance measurement systems and the frequency of performance measurement. We concluded that somewhat large differences exist between main contractors and subcontractors in terms of the use of selection criteria and that performance measurement is not universally applied in the Czech construction sector.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>SC</sub> - Article in a specialist periodical, which is included in the SCOPUS database

  • CEP classification

  • OECD FORD branch

    20101 - Civil engineering

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2020

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Periodica Polytechnica, Social and Management Sciences

  • ISSN

    1416-3837

  • e-ISSN

  • Volume of the periodical

    28

  • Issue of the periodical within the volume

    2

  • Country of publishing house

    HU - HUNGARY

  • Number of pages

    7

  • Pages from-to

    155-161

  • UT code for WoS article

  • EID of the result in the Scopus database

    2-s2.0-85092719159