All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Impacts of Determining Economic Life of Large-Scale Infrastructure Projects on Their Economic Effectiveness

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F22%3APU144385" target="_blank" >RIV/00216305:26110/22:PU144385 - isvavai.cz</a>

  • Result on the web

    <a href="https://www.frontiersin.org/articles/10.3389/fbuil.2022.908300/full?&utm_source=Email_to_authors_&utm_medium=Email&utm_content=T1_11.5e1_author&utm_campaign=Email_publication&field=&journalName=Frontiers_in_Built_Environment&id=908300" target="_blank" >https://www.frontiersin.org/articles/10.3389/fbuil.2022.908300/full?&utm_source=Email_to_authors_&utm_medium=Email&utm_content=T1_11.5e1_author&utm_campaign=Email_publication&field=&journalName=Frontiers_in_Built_Environment&id=908300</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.3389/fbuil.2022.908300" target="_blank" >10.3389/fbuil.2022.908300</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Impacts of Determining Economic Life of Large-Scale Infrastructure Projects on Their Economic Effectiveness

  • Original language description

    The paper deals with the refinement of the Cost-Benefit Analysis methodological procedure for the assessment of the economic effectiveness of large-scale transport infrastructure projects. The basic input is economic Cash Flow which consists of investment costs, operating income, operating expenses, societal benefits, and harms as well as the investment residual value. According to the methodological guidelines, the currently evaluated project period is considered to be 30 years including the investment phase starting in the first year of the construction, the relevant part of the operational phase, and the residual value of the project in the last year of the assessed period. The evaluation of the economic effectiveness of projects is largely influenced by the determination of the construction economic life. A procedure for calculating the residual value of the project while respecting the gradual implementation of partial constructions was established as part of the research. A case study based on the research sample of several investment construction projects of the highway sections in the Czech Republic demonstrates how this methodological procedure affects the economic effectiveness of the project.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database

  • CEP classification

  • OECD FORD branch

    20104 - Transport engineering

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2022

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Frontiers in Built Environment

  • ISSN

    2297-3362

  • e-ISSN

  • Volume of the periodical

    8

  • Issue of the periodical within the volume

    1

  • Country of publishing house

    CH - SWITZERLAND

  • Number of pages

    6

  • Pages from-to

    1-6

  • UT code for WoS article

    000796561400001

  • EID of the result in the Scopus database

    2-s2.0-85130010925