All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Connecting performance measurement systems with risk management

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F23%3APU148796" target="_blank" >RIV/00216305:26110/23:PU148796 - isvavai.cz</a>

  • Result on the web

    <a href="https://pubs.aip.org/aip/acp/article/2887/1/020028/2906319/Connecting-performance-measurement-systems-with" target="_blank" >https://pubs.aip.org/aip/acp/article/2887/1/020028/2906319/Connecting-performance-measurement-systems-with</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1063/5.0159029" target="_blank" >10.1063/5.0159029</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Connecting performance measurement systems with risk management

  • Original language description

    In recent times, systems for measuring construction contracts are increasingly being combined with systems designed to measure and manage project risks. The aim of our research was to identify how much weight Czech construction companies give to individual areas of risk measurement and how the individual risk management areas differ in terms of their perceived importance. Another goal was to find out whether companies attach more importance to traditional or newly introduced project risk measurement areas. The first part of the paper defines the individual areas and methods of project risk measurement. The second part presents the results of a broad questionnaire survey that was conducted with a set of clearly defined questions focusing on the importance of the individual risk management areas. The results show that Czech construction companies attach the most importance to the traditional areas of risk management comprising mainly financial risks, namely project cost overruns. The outputs presented in this paper will support the next part of the research, which will focus on connecting risk management practices with the measurement of contract efficiency in the Czech construction industry to serve as a basis for the development of a system for measuring construction contracts.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    20101 - Civil engineering

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2023

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    14TH CONFERENCE OF CIVIL AND ENVIRONMENTAL ENGINEERING FOR PHD STUDENTS AND YOUNG SCIENTISTS: YOUNG SCIENTIST 2022 (YS22)

  • ISBN

    978-0-7354-4600-7

  • ISSN

    1551-7616

  • e-ISSN

  • Number of pages

    5

  • Pages from-to

    1-5

  • Publisher name

    AIP Publishing

  • Place of publication

    Melville, NY

  • Event location

    Čingov

  • Event date

    Jun 27, 2023

  • Type of event by nationality

    EUR - Evropská akce

  • UT code for WoS article