All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Reliability of the grouting of tendons under consideration of uncertainties under on-site conditions

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F23%3APU149635" target="_blank" >RIV/00216305:26110/23:PU149635 - isvavai.cz</a>

  • Result on the web

    <a href="https://www.matec-conferences.org/articles/matecconf/abs/2023/12/matecconf_ys2023_01004/matecconf_ys2023_01004.html" target="_blank" >https://www.matec-conferences.org/articles/matecconf/abs/2023/12/matecconf_ys2023_01004/matecconf_ys2023_01004.html</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1051/matecconf/202338501004" target="_blank" >10.1051/matecconf/202338501004</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Reliability of the grouting of tendons under consideration of uncertainties under on-site conditions

  • Original language description

    This paper contributes to the body of knowledge from German research work Deutscher Ausschuss für Stahlbeton and from author’s experiences, to improve the reliability of cable ducts grouting. The complete and reliable filling of post-tensioned tendons with grout is necessary to protect the prestressing steel against corrosion and for bond between prestressing steel and the concrete structure, which is in both limit states applied. Diagnostics of bridges built in the last century showed the cases of faulty grouting of cable ducts. These faults are cause of corrosion prestressing steel often. Based on these diagnostics, bridges are after 35 to 70 years of service life demolished, although service life of these bridges was to 100 years declared. In the studied research work were investigated the effects of individual components, procedures and conditions of the grout and results of grouting investigated. Tests have been performed both on the experiment cable ducts and the real structures. Based on this paper, certain principles have been recommended that aim to prevent grouting faults and to improve the reliability of the grouting. In these recommendations are suggestions of controls of grouting included

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    20102 - Construction engineering, Municipal and structural engineering

Result continuities

  • Project

    <a href="/en/project/CK01000042" target="_blank" >CK01000042: Specification of residual load-capacity of prestressed bridges</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2023

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    MATEC Web Conf. Volume 385, 2023, The 15th International Scientific Conference of Civil and Environmental Engineering for the PhD. Students and Young Scientists – Young Scientist 2023 (YS23)

  • ISBN

  • ISSN

    2261-236X

  • e-ISSN

  • Number of pages

    12

  • Pages from-to

    1-12

  • Publisher name

    EDP Sciences

  • Place of publication

    Francie

  • Event location

    Štrbské pleso

  • Event date

    Mar 29, 2023

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article