Combined Heuristic Approach to Resource-Constrained Project Scheduling Problem
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26210%2F10%3APU90253" target="_blank" >RIV/00216305:26210/10:PU90253 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Combined Heuristic Approach to Resource-Constrained Project Scheduling Problem
Original language description
This article deals with the resource-constrained project scheduling problem that belongs to NP-hard optimisation problems.
Czech name
—
Czech description
—
Classification
Type
J<sub>x</sub> - Unclassified - Peer-reviewed scientific article (Jimp, Jsc and Jost)
CEP classification
BD - Information theory
OECD FORD branch
—
Result continuities
Project
<a href="/en/project/GA102%2F09%2F1680" target="_blank" >GA102/09/1680: Control Algorithm Design by Means of Evolutionary Approach</a><br>
Continuities
Z - Vyzkumny zamer (s odkazem do CEZ)<br>S - Specificky vyzkum na vysokych skolach
Others
Publication year
2010
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Name of the periodical
Lecture notes in Electrical Engineering
ISSN
1876-1100
e-ISSN
—
Volume of the periodical
2010
Issue of the periodical within the volume
68
Country of publishing house
GB - UNITED KINGDOM
Number of pages
11
Pages from-to
—
UT code for WoS article
—
EID of the result in the Scopus database
—