All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Waste-to-energy facility planning under uncertain circumstances

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26210%2F13%3APU104632" target="_blank" >RIV/00216305:26210/13:PU104632 - isvavai.cz</a>

  • Result on the web

    <a href="http://dx.doi.org/10.1016/j.applthermaleng.2013.04.003" target="_blank" >http://dx.doi.org/10.1016/j.applthermaleng.2013.04.003</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1016/j.applthermaleng.2013.04.003" target="_blank" >10.1016/j.applthermaleng.2013.04.003</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Waste-to-energy facility planning under uncertain circumstances

  • Original language description

    The paper deals with the development and presentation of the use of an advanced computational optimization tool for the conceptual planning of facilities in the field of waste-to-energy. The determination of the suitable capacity and sizing of an appropriate heat recovery system, according to adopted heat utilization strategy (i.e. either only electricity production or combined heat and power if feasible), represent crucial decisions about each individual incineration plant in its early project stage. The economic feasibility of the project should be guaranteed at the same time. The feasibility is measured by internal rate of return. An optimization model supporting such decisions was built and is introduced. Building a new incinerator, from the initial considerations to its full operation, is a long-term process with duration at a minimum of 5?7 years. The erection is then followed by an operational phase exceeding 20 years. The unclear future development of important parameters affec

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>x</sub> - Unclassified - Peer-reviewed scientific article (Jimp, Jsc and Jost)

  • CEP classification

    JP - Industrial processes and processing

  • OECD FORD branch

Result continuities

  • Project

    <a href="/en/project/EE2.3.20.0020" target="_blank" >EE2.3.20.0020: System for enhancement of research teams in mechanical engineering and border studies</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2013

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Applied Thermal Engineering

  • ISSN

    1359-4311

  • e-ISSN

  • Volume of the periodical

    61

  • Issue of the periodical within the volume

    1

  • Country of publishing house

    US - UNITED STATES

  • Number of pages

    9

  • Pages from-to

    106-114

  • UT code for WoS article

  • EID of the result in the Scopus database