Initial Cost Benefit Analysis for TSAA+ / SESAR SOLUTION PJ.11-A4 (SA+): Initial COST BENEFIT ANALYSIS (CBA)
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26210%2F18%3APU148566" target="_blank" >RIV/00216305:26210/18:PU148566 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Initial Cost Benefit Analysis for TSAA+ / SESAR SOLUTION PJ.11-A4 (SA+): Initial COST BENEFIT ANALYSIS (CBA)
Original language description
In V1, the CBA focuses more on scoping the solution, identifying its interdependencies on other solutions and implementation options, the stakeholders impacted, describing in qualitative terms the BIMs in the OSED, including the most impacted KPAs and KPIs. Cost drivers are also identified. This work should start jointly with validation activities so that the definition of scenarios and metrics used to capture benefits in validation takes account of the CBA needs. In V1, the output is in principle a qualitative description of the benefits and costs of the solution to the different impacted stakeholders with the aim to ensure understanding what the solution will bring – order of magnitude. The SESAR solution under the scope of this document is SA+, further referred as TSAA+. SA+ capability refers to enhancement of already standardized ADS-B IN Traffic Situational Awareness with Alerts (TSAA) application enhanced to use information about intruder’s RA (Resolution Advisory), if TCAS- equipped and indica
Czech name
—
Czech description
—
Classification
Type
O - Miscellaneous
CEP classification
—
OECD FORD branch
20304 - Aerospace engineering
Result continuities
Project
—
Continuities
S - Specificky vyzkum na vysokych skolach
Others
Publication year
2018
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů