All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

A Heat and Power Pinch for Process Integration targeting in hybrid energy systems

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26210%2F21%3APU140408" target="_blank" >RIV/00216305:26210/21:PU140408 - isvavai.cz</a>

  • Result on the web

    <a href="https://www.sciencedirect.com/science/article/pii/S0301479721003674?via%3Dihub" target="_blank" >https://www.sciencedirect.com/science/article/pii/S0301479721003674?via%3Dihub</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1016/j.jenvman.2021.112305" target="_blank" >10.1016/j.jenvman.2021.112305</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    A Heat and Power Pinch for Process Integration targeting in hybrid energy systems

  • Original language description

    Hybrid energy systems have been widely used for residential and industrial purposes. In this system, the total energy requirement of each unit can be met with heat and electricity. Pinch Analysis becomes a widely used tool for Process Integration, and using Pinch Analysis for Heat Integration is well-established. However, for the combined heat and power system, the theory and the corresponding tool deserve some more development. This paper extended the Pinch Analysis concept and proposed a Heat and Power Pinch Analysis to target the amount of heat that should be recovered from the hybrid energy system. Heat and Power Composite Curve (HPCC) is developed to visualise the total energy and the separated heat and power (electricity) requirement of a hybrid energy system in a working time period. The amount of outsourced electricity that should be purchased, and stored electricity at the startup period, and the extra electricity generated by the system at the end of the working period can be demonstrated. A case is studied to illustrate the steps of using this tool, two scenarios are discussed, and the targets are shown. © 2021 Elsevier Ltd

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database

  • CEP classification

  • OECD FORD branch

    20704 - Energy and fuels

Result continuities

  • Project

    Result was created during the realization of more than one project. More information in the Projects tab.

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2021

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    JOURNAL OF ENVIRONMENTAL MANAGEMENT

  • ISSN

    0301-4797

  • e-ISSN

    1095-8630

  • Volume of the periodical

    neuveden

  • Issue of the periodical within the volume

    287

  • Country of publishing house

    GB - UNITED KINGDOM

  • Number of pages

    5

  • Pages from-to

    112305-112305

  • UT code for WoS article

    000639213700006

  • EID of the result in the Scopus database

    2-s2.0-85102885190