All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Economical Evaluation of Telecontrolled Switches in MV Distribution System Using the Costs of Penalty Payments

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26220%2F08%3APU76515" target="_blank" >RIV/00216305:26220/08:PU76515 - isvavai.cz</a>

  • Result on the web

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    angličtina

  • Original language name

    Economical Evaluation of Telecontrolled Switches in MV Distribution System Using the Costs of Penalty Payments

  • Original language description

    The application of the telecontrolled switches in MV distribution systems is an effective tool for influencing the electricity supply continuity perceived by individual customers considerably. In this way, it is also a tool for reducing the possible costs of penalty payments resulting from breaching the customer's standards of electricity supply continuity. As the paper presents, inclusion of the costs of penalty payments into the economical evaluation of telecontrolled switches application leads to a different optimal solution when compared with the evaluation of the costs of energy not supplied. The comparison is based on a model example of an overhead MV distribution system. The paper considers two types of telecontrolled switches - reclosers and telecontrolled section switches. Monte Carlo simulation method is used to estimations of the reliability of the system before and after the application of the telecontrol. In the simulation, the process of successive restoration is approxim

  • Czech name

    Economical Evaluation of Telecontrolled Switches in MV Distribution System Using the Costs of Penalty Payments

  • Czech description

    The application of the telecontrolled switches in MV distribution systems is an effective tool for influencing the electricity supply continuity perceived by individual customers considerably. In this way, it is also a tool for reducing the possible costs of penalty payments resulting from breaching the customer's standards of electricity supply continuity. As the paper presents, inclusion of the costs of penalty payments into the economical evaluation of telecontrolled switches application leads to a different optimal solution when compared with the evaluation of the costs of energy not supplied. The comparison is based on a model example of an overhead MV distribution system. The paper considers two types of telecontrolled switches - reclosers and telecontrolled section switches. Monte Carlo simulation method is used to estimations of the reliability of the system before and after the application of the telecontrol. In the simulation, the process of successive restoration is approxim

Classification

  • Type

    D - Article in proceedings

  • CEP classification

    JE - Non-nuclear power engineering, energy consumption and utilization

  • OECD FORD branch

Result continuities

  • Project

  • Continuities

    Z - Vyzkumny zamer (s odkazem do CEZ)

Others

  • Publication year

    2008

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Proceeding 10th International Conference on Probabilistic Method Applied to Power Systems [CD-ROM]

  • ISBN

    978-84-690-9441-9

  • ISSN

  • e-ISSN

  • Number of pages

    6

  • Pages from-to

  • Publisher name

    Neuveden

  • Place of publication

    Rincon, Puerto Rico

  • Event location

    Rincon

  • Event date

    May 23, 2008

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article