Transient Overvoltages on Distribution Underground Cable Inserted in Overhead Line
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26220%2F09%3APU82535" target="_blank" >RIV/00216305:26220/09:PU82535 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Transient Overvoltages on Distribution Underground Cable Inserted in Overhead Line
Original language description
This paper summarizes the main results of a study aimed at determining the maximum lightning overvolages in the underground cables. The study considers the situation of a cable inserted in an overhead line that is protected by surge arresters at both ends and is subjected to lightning overvoltages. The digital model in EMTP ATP program was created for the analysis of this situation with respect to the real arrangement of the underground cables in distribution network and random nature of the lightning strokes.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
JE - Non-nuclear power engineering, energy consumption and utilization
OECD FORD branch
—
Result continuities
Project
<a href="/en/project/2A-2TP1%2F051" target="_blank" >2A-2TP1/051: Improving Reliability and Safety of Electrical Networks.</a><br>
Continuities
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Others
Publication year
2009
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
Proceeding of 20th International Conference and Exhibition on Electricity Distribution CIRED
ISBN
978-1-84919-126-5
ISSN
—
e-ISSN
—
Number of pages
6
Pages from-to
—
Publisher name
Neuveden
Place of publication
Neuveden
Event location
Prague
Event date
Jun 8, 2009
Type of event by nationality
WRD - Celosvětová akce
UT code for WoS article
—