All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

The verification of shunting method for limitation of earth fault current in MV compensated networks

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26220%2F10%3APU91119" target="_blank" >RIV/00216305:26220/10:PU91119 - isvavai.cz</a>

  • Result on the web

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    angličtina

  • Original language name

    The verification of shunting method for limitation of earth fault current in MV compensated networks

  • Original language description

    The paper deals with verification of shunting method for limitation of earth fault current in MV compensated networks. The verification was done by experimental measuring which was realized in distribution network held by E.ON Czech Republic. There weremade a few different fault (low-impedance, spark gap arc, damaged MV cable, 1.6kOhm, 0.4kOhm and unearthed console of concrete tower) for three different places, for tuned and untuned Petersen coil and for some types of faults for all phases too, that means forty eight experimental faults. During each experiment the shunting of affected phase was applied. The first results of fault currents and voltages analysis show that after closing the shunting circuit breaker the fault current decreases practicallyto zero that means the method of connecting of affected phase to the earthing system of substation seems be very perspective for protection the point of fault.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

    JE - Non-nuclear power engineering, energy consumption and utilization

  • OECD FORD branch

Result continuities

  • Project

    <a href="/en/project/2A-2TP1%2F051" target="_blank" >2A-2TP1/051: Improving Reliability and Safety of Electrical Networks.</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2010

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Proceedings of the Congreso Internacional de Distribución Eléctrica

  • ISBN

    978-987-97399-3-8

  • ISSN

  • e-ISSN

  • Number of pages

    6

  • Pages from-to

    1-6

  • Publisher name

    CIDEL

  • Place of publication

    Buenos Aires, Argentina

  • Event location

    Buenos Aires, Argentina

  • Event date

    Sep 27, 2010

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article