Logistic Warehouse Process Optimization through Genetic Programming Algorithm
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26220%2F14%3APU107978" target="_blank" >RIV/00216305:26220/14:PU107978 - isvavai.cz</a>
Result on the web
<a href="http://dx.doi.org/10.1007/978-3-319-06740-7_3" target="_blank" >http://dx.doi.org/10.1007/978-3-319-06740-7_3</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1007/978-3-319-06740-7_3" target="_blank" >10.1007/978-3-319-06740-7_3</a>
Alternative languages
Result language
angličtina
Original language name
Logistic Warehouse Process Optimization through Genetic Programming Algorithm
Original language description
This paper introduces process planning, scheduling and optimization in warehouse environment. The leading companies of the logistics warehouse industry still do not use planning and scheduling by automatic computer methods. Processes are planned and scheduled by an operational manager with detailed knowledge of the problem, processed tasks and commodities, warehouse layout, performance of employees, parameters of equipment etc. This is a quantum of information to be handled by a human and it can be very time-consuming to plan every process and schedule the timetable. The manager is usually also inuenced by stress conditions, especially by the time of holidays when everyone is making supplies and the performance of the whole warehouse management goes down. The main contribution of this work is a) to introduce the novel automatic method for optimization based on the evolutionary method called genetic programming, b) to give a description of a tested warehouse, and c) to show the metrics for performance measurement and to give a results which states the baseline for further research.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
—
OECD FORD branch
10201 - Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)
Result continuities
Project
<a href="/en/project/FR-TI1%2F444" target="_blank" >FR-TI1/444: Research and development of the system for manufacturing optimization</a><br>
Continuities
S - Specificky vyzkum na vysokych skolach
Others
Publication year
2014
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
Advances in Intelligent Systems and Computing, Modern Trends and Techniques in Computer Science
ISBN
978-3-319-06739-1
ISSN
—
e-ISSN
—
Number of pages
12
Pages from-to
29-40
Publisher name
Springer
Place of publication
Neuveden
Event location
Tomas Bata University in Zlin
Event date
Apr 28, 2014
Type of event by nationality
WRD - Celosvětová akce
UT code for WoS article
000370620000003