All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Recent Challenges Regarding the Verification of Photovoltaic Inverters Properties and their Compliance with Technical Requirements

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26220%2F23%3APU149321" target="_blank" >RIV/00216305:26220/23:PU149321 - isvavai.cz</a>

  • Result on the web

    <a href="http://acta.uni-obuda.hu/Vojtek_Mastny_Moravek_Drapela_Vrana_Dvoracek_140.pdf" target="_blank" >http://acta.uni-obuda.hu/Vojtek_Mastny_Moravek_Drapela_Vrana_Dvoracek_140.pdf</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.12700/APH.20.11.2023.11.5" target="_blank" >10.12700/APH.20.11.2023.11.5</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Recent Challenges Regarding the Verification of Photovoltaic Inverters Properties and their Compliance with Technical Requirements

  • Original language description

    Distributed generation by renewable energy sources, is a new phenomenon in recent years and it brings several challenges for electric power system operations. Given that, distributed generators shall be strictly in compliance with relevant standards and technical requirements, to preserve current level of quality and reliability of electric power supply. Therefore, this research is aimed at compliance verification of non-synchronous power generating modules, with any relevant requirements. At the beginning, it provides comprehensive review on this issue including historical development, the current situation in the Czech Republic and relationships between legislation and standards, currently in force. The main contribution of the paper lies in the experiments performed on photovoltaic inverters, which represent the key components of photovoltaic systems and are responsible for fulfilling the imposed operational requirements. The results provide a real-world picture of the current state, in this field. We found that none of the tested inverters fulfilled the requirements to the full extent and therefore, we recommend careful verification of the power generating modules, units or component's ability in this regard, before commissioning.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database

  • CEP classification

  • OECD FORD branch

    20201 - Electrical and electronic engineering

Result continuities

  • Project

    <a href="/en/project/TK04020103" target="_blank" >TK04020103: Fully parameterized inverter with secure setting and communication protocol</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2023

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    ACTA POLYTECH HUNG

  • ISSN

    1785-8860

  • e-ISSN

    2064-2687

  • Volume of the periodical

    20

  • Issue of the periodical within the volume

    11

  • Country of publishing house

    HU - HUNGARY

  • Number of pages

    20

  • Pages from-to

    63-82

  • UT code for WoS article

    001150591300005

  • EID of the result in the Scopus database

    2-s2.0-85177568982