Fuzzy Logic: An Instrument Fuzzy Logic: An Instrument for the Evaluation of Project Status

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26510%2F15%3APU114870" target="_blank" >RIV/00216305:26510/15:PU114870 - isvavai.cz</a>

  • Result on the web

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    angličtina

  • Original language name

    Fuzzy Logic: An Instrument Fuzzy Logic: An Instrument for the Evaluation of Project Status

  • Original language description

    This article considers the use of fuzzy logic to support the evaluation of project status. A brief description of fuzzy set theory, fuzzy logic and the process of calculation is given. The major goal of this paper is to present an expert decision-making fuzzy model for evaluating project status. The model results from the application of the Fuzzy Logic Toolbox. This fuzzy model is based on two basic indices, schedule performance index (SPI) and cost performance index (CPI), of earned value management (EVM). The advantage of the fuzzy model is the ability to transform the input indices SPI and CPI into linguistic variables, as well as linguistic evaluation of overall project status (output). With this approach it is possible to simulate the risk and uncertainty that are always associated with real projects. The scheme of the model, rule block, attributes and their membership functions are mentioned in a case study. The case study contains real data on the development of values of indices SPI and CPI for one project in the field of IT (data file). The analysed project ran from March 2012 to July 2012. The indices SPI and CPI were obtained from control project milestones. There are 5 control milestones in total. The parameters of the model are adjusted on the basis of the data file for each of the variables. The use of fuzzy logic is a particular advantage in decision-making processes where description by algorithms is extremely difficult and criteria are multiplied.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>SC</sub> - Article in a specialist periodical, which is included in the SCOPUS database

  • CEP classification

  • OECD FORD branch

    50602 - Public administration

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2015

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Revista de Metodos Cuantitativos para la Economia y la Empresa

  • ISSN

    1886-516X

  • e-ISSN

  • Volume of the periodical

    19 (2015)

  • Issue of the periodical within the volume

    June

  • Country of publishing house

    ES - SPAIN

  • Number of pages

    19

  • Pages from-to

    2-23

  • UT code for WoS article

  • EID of the result in the Scopus database

    2-s2.0-84939241954