Success Evaluation Model for Project Management
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26510%2F16%3APU121275" target="_blank" >RIV/00216305:26510/16:PU121275 - isvavai.cz</a>
Result on the web
<a href="http://www.ekonomie-management.cz/download/1480960693_702e/12_SUCCESS+EVALUATION+MODEL.pdf" target="_blank" >http://www.ekonomie-management.cz/download/1480960693_702e/12_SUCCESS+EVALUATION+MODEL.pdf</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.15240/tul/001/2016-4-012" target="_blank" >10.15240/tul/001/2016-4-012</a>
Alternative languages
Result language
angličtina
Original language name
Success Evaluation Model for Project Management
Original language description
The article presents an expert fuzzy model for evaluation of the project success rate. The model is implemented with the use of fuzzy logic. First, fundamental theoretical principles related to the problems of project success rate, fuzzy sets and fuzzy logic are introduced, after which a fuzzy model for project success rate evaluation, including partial sub-models, is presented in the form of a case study which represents the main goal of the article. The fuzzy model is implemented in the MATLAB software environment with the use of the Fuzzy Logic Toolbox application, where it is also verified and further specified. The fuzzy model consists of six input variables which are divided according to their character into three categories in each block (RB1, RB2, RB3) and are separately evaluated. Partial outputs from the blocks (RB1, RB2, RB3) are simultaneously inputs for block RB4, from which there is a single output variable – project success (PS). The RB1 rule block evaluates the situation from the point of view of the state of the project. The RB2 rule block evaluates the total value of project risk. The RB3 rule block evaluates project quality. The RB4 rule block evaluates the total project success rate. Experimenting with the fuzzy model allows simulation of the uncertainty that is always involved in projects. The case study introduces an overall diagram of the fuzzy model, the input and output variables, including their attributes, and the evaluation rules of the four rule blocks. The proposed fuzzy model is used to evaluate project success primarily in the implementation phase, then repeatedly after each phase of the project is completed. This provides project managers with a tool that allows relatively rapid evaluation of the success of the project and the opportunity of applying appropriate measures in good time if necessary.
Czech name
—
Czech description
—
Classification
Type
J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database
CEP classification
—
OECD FORD branch
50202 - Applied Economics, Econometrics
Result continuities
Project
—
Continuities
S - Specificky vyzkum na vysokych skolach
Others
Publication year
2016
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Name of the periodical
E a M: Ekonomie a Management
ISSN
1212-3609
e-ISSN
—
Volume of the periodical
19
Issue of the periodical within the volume
4
Country of publishing house
CZ - CZECH REPUBLIC
Number of pages
19
Pages from-to
167-185
UT code for WoS article
000393198000012
EID of the result in the Scopus database
2-s2.0-85006013729