All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Root Cause Analysis in Post Project Phases as Application of Knowledge Management

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26510%2F19%3APU131696" target="_blank" >RIV/00216305:26510/19:PU131696 - isvavai.cz</a>

  • Result on the web

    <a href="http://www.mdpi.com/2071-1050/11/6/1667" target="_blank" >http://www.mdpi.com/2071-1050/11/6/1667</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.3390/su11061667" target="_blank" >10.3390/su11061667</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Root Cause Analysis in Post Project Phases as Application of Knowledge Management

  • Original language description

    This paper is focused on the root cause analysis of post project phases. The research has been linked to the identification of the 21 most common reasons for not executing post project phases. The main aim of this paper is to identify the root causes of not executing selected post project phases. The empirical research was performed as qualitative research employing the observation and inquiry methods in the form of a controlled semi-structured interview. The research was realised in the Czech Republic in 2017 and 2018. The key performances for ensuring a functional, effective and systematic post project process are based on the principles of knowledge management. The identified causes were used as inputs for the proposed measures with the aim to make the post project process more effective. The main contribution of the paper is the overview of techniques that may be recommended for post project analysis. These techniques are demonstrated in detail on particular examples of the analysis of the most common reasons for failure to implement post project phases. The described examples demonstrate the procedure to be followed in order to identify the root cause of the analysed phenomenon. At the same time, the paper also describes proposals of recommended measures that should minimize the root causes resulting in negative outcomes. The paper explicitly emphasizes and shows the connection between knowledge management and post project phase effectiveness.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database

  • CEP classification

  • OECD FORD branch

    50704 - Environmental sciences (social aspects)

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2019

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Sustainability

  • ISSN

    2071-1050

  • e-ISSN

  • Volume of the periodical

    11

  • Issue of the periodical within the volume

    6

  • Country of publishing house

    CH - SWITZERLAND

  • Number of pages

    15

  • Pages from-to

    1-15

  • UT code for WoS article

    000465613000122

  • EID of the result in the Scopus database

    2-s2.0-85063538876